Information
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Consumer Unit and other Electrical Equipment
-
Are consumer unit(s) and other electrical equipment in a safe condition?
-
Main earthing arrangement verified?
-
Main equipotential bonding verified?
-
Is the consumer unit clearly labelled?
-
Have RCD's/RCBO's been fitted to all new circuits?
Pre Work Checks
-
Does the operative have evidence of relevant qualifications to hand?
-
Has the operative been inducted to site?
-
Has the operative signed all task specific RAMS?
-
Has the operative signed in and completed point of work risk assessment?
-
Is a Next Energy site safety board present, secured and visible?
-
Has an asbestos survey been completed at the property?
-
Is the operative aware of requirements when dealing with asbestos?
Working Safely
-
Has Safe Isolation been carried out in accordance with company policy?
-
Has all access equipment been inspected prior to use?
-
Has operatives test equipment been calibrated and in good working order?
-
Has all portable electrical equipment been PAT tested?
-
Are all extension leads etc. located in a safe position to prevent mechanical or other damage to plant or members of the public?
-
Have all hand tools been inspected prior to use?
-
Is operative wearing Next Energy hi-visibility clothing?
-
Is operative wearing task specific PPE?
-
Does the operative have a satisfactory method to ensure members of the public and other trades are not subject to danger due to works being carried out?
-
All measures being completed in accordance with QMS?
-
All work areas clean and free from loose tools and debris?
-
Is overall job of an acceptable standard?
-
Is the customer happy with all work being carried out by Next Energy?
Signature
-
Supervisor Signature
-
Operative Signature