Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Cladding backing structure
-
Site: Wembley Park NW07-NW08
-
Client: Wates
-
Checked on behalf of MPrice
-
Location
-
Block/phase
Requirements
-
Are relevant drawings available on site?
Checklist
Brackets
-
Are the helping hand brackets correct with isolation packer?
-
Are the helping hand brackets fitted plum?
-
Are the correct 8mm/50mm tek fixings with rubber washer used?
Rails
-
Are backing rails fitted correctly and plum?
-
Have the correct fixing been used to fix the rails to the helping hand brackets?
-
Are the gaskets installed on rail ?
Waterproofing/sealing
-
Has relevant waterproofing been fitted?
-
Is the waterproofing sealed and damage free?
-
Has foil tape been used correctly on joints to ensure there are no exposed joints or edges?
Insulation
-
Has the correct size/type of insulation been used?
Brick work areas
Ancon channels
-
Have the ancon channels been correctly fitted?
-
Has the correct kingspan been used and edges sealed with foil tape?
-
Have the correct fixings been used and covered with foil tape ?
Photos of Inspected works
-
Photos of cladding backing structure
Comments
-
Are there any comments?
Signature
-
Checked on behalf of MPrice
-
Checked on behalf of Wates (deemed accepted if not returned by 1700 2 days after offered by MPrice)