Title Page
-
Conducted on
-
Prepared by
-
Location
-
Building Type
-
Plot Number
Front Entrance Porch
-
Door bell working
-
Porch light working
-
Porch complete to a high standard
-
Porch supports and soffits complete
-
Canopy in good condition and free from debris
Front Door
-
Door furniture free from paint and debris
-
Door furniture in good condition and operational
-
Glazing and beads free from paint and debris
-
Glazing and beads fitted to a high standard
-
Door frame and any sidelight complete and free from debris
-
Draught excluders fitted
-
Storm cill and weather bar fitted
-
Letter box and back flap fitted and free from debris
-
Door fits neatly into frame
-
Door is clean and free from paint and debris
-
Door is in good condition and not dented or scratched
Odour
-
Do the premises smell clean and fresh with no foul odours
Entrance Hall
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Glazing and beads free from paint and debris
-
Room thermostat fitted, level and working
-
Radiator fitted and level
-
Powerpoints clean and level
-
Intruder alarm system clean, square and working
-
Light fittings and switches clean and working
Cloakroom
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Glazing and beads free from paint and debris
-
Radiator fitted and level
-
Taps working
-
Sanitaryware including toilet seat clean, working and undamaged
-
Plugs and chains fitted
-
Pedestal straight
-
Boxing / pipe casings complete
-
Wastes and pipeworks tested for leaks
-
Entry points in pipes and waste sealed
-
Light switch and / pull cord and extractor fan clean and working
-
Silicone sealing complete
-
Basin clean and blemish free
Lounge
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Fireplace and surround secure, undamaged and clean
-
Fire back and flue opening fitted
-
Window cill level and finished to a high standard
-
Patio doors including glazing, locks and fittings clean, undamaged and fitted to a high standard
-
TV point clean and level
-
FibreNest point clean and level
-
Light fittings and switches clean and working
Cupboard Under Stairs
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Consumer unit labelled, clean and square
Dining Room
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Patio doors including glazing, locks and fittings clean, undamaged and fitted to a high standard
-
Light fittings and switches clean and working
Family Room
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Patio doors including glazing, locks and fittings clean, undamaged and fitted to a high standard
-
Light fittings and switches clean and working
Study
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Patio doors including glazing, locks and fittings clean, undamaged and fitted to a high standard
-
Light switches and fittings clean and working
Kitchen
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Patio doors including glazing, locks and fittings clean, undamaged and fitted to a high standard
-
Light fittings and switches clean and working
-
Sink clean, free from scratches and undented
-
Cooker hood level, clean and working
-
Dishwasher plumbed in, waste and cold supply
-
Taps working, clean and free from damage
-
Plugs and chains fitted
-
Worktops clean and undamaged, joints neat and tidy
-
Wall units fitted square and level, check all furniture, drawers shelves and doors clean and undamaged
-
Base units fitted square and level, check all furniture, drawers shelves and doors clean and undamaged
-
Margins equal to drawers and doors
-
Plinths fitted to base units
-
Pelmet and cornice free from chips and joints tidy
-
Under pelmet lighting hidden working and wiring hidden
-
Silicone sealant tidy and complete
-
Hob and oven fitted and working
-
Fridge / freezer fitted and working
-
Floor even and clean, no broken or scratched tiles
Utility Room
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Light fittings and switches clean and working
-
Sink clean, free from scratches and undented
-
Boiler casing and programmer clean and working
-
Entry points of pipes, wastes and fittings sealed
-
Entry point of boiler flue sealed and complete
-
Washing machine plumbed in, waste, hot and cold supplies plumbed in
-
Taps working, clean and free from damage
-
Plugs and chains fitted
-
Worktops clean and undamaged, joints neat and tidy
-
Wall units fitted square and level, check all furniture, drawers shelves and doors clean and undamaged
-
Base units fitted square and level, check all furniture, drawers shelves and doors clean and undamaged
-
Margins equal to drawers and doors
-
Plinths fitted to base units
-
Pelmet and cornice free from chips and joints tidy
-
Under pelmet lighting hidden working and wiring hidden
-
Silicone sealant tidy and complete
-
Hob and oven fitted and working
-
Fridge / freezer fitted and working
-
Floor even and clean, no broken or scratched tiles
Back Door
-
Door furniture free from paint and debris
-
Door furniture in good condition and operational
-
Glazing and beads free from paint and debris
-
Glazing and beads fitted to a high standard
-
Door frame and any sidelight complete and free from debris
-
Draught excluders fitted
-
Storm cill and weather bar fitted
-
Door fits neatly into frame
-
Door is clean and free from paint and debris
-
Door is in good condition and not dented or scratched
Stairs and Landing
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Light fittings and switches clean, level and working
-
Quadrant / beading fitted to staircase string
-
Handrail fitted and painted to a high standard
-
Spindles all fixed and secure
-
Paintwork to staircase complete and uniform
-
Treads and risers fixed, no movement, protections removed
Bedroom 1
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Light fittings and switches clean and working
En-Suite Bathroom
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Window cill level and finished to a high standard
-
Light fittings and switches clean and working
-
Extractor fan working
-
Basin clean and blemish free
-
Sanitaryware including toilet seat clean, working and undamaged
-
Bath and panels, taps, plugs and chains clean and working
-
Wall tiling complete, clean, no broken, chipped or cracked tiles
-
Grout lines clean and tidy
-
Shower cubicle or frame complete
-
Shower tray clean and free from crathes or blemishes
-
Shaver point and light working
-
Silicone sealant tidy and complete
-
Pedestal straight
Family Bathroom
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Window cill level and finished to a high standard
-
Light fittings and switches clean and working
-
Extractor fan working
-
Basin clean and blemish free
-
Sanitaryware including toilet seat clean, working and undamaged
-
Bath and panels, taps, plugs and chains clean and working
-
Wall tiling complete, clean, no broken, chipped or cracked tiles
-
Grout lines clean and tidy
-
Shower cubicle or frame complete
-
Shower tray clean and free from crathes or blemishes
-
Shaver point and light working
-
Silicone sealant tidy and complete
-
Pedestal straight
Bedroom 2
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Light fittings and switches clean and working
Bedroom 3
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Light fittings and switches clean and working
Bedroom 4
-
Wall finish to a high standard - Plaster and paint
-
Ceiling and cove completed and to a high standard
-
Floor complete to a high standard
-
Door furniture operational and undamaged
-
Door frames, architraves and skirting complete and to a high standard and free from paint and debris
-
Glazing free from scratches, debris and clean
-
Window, window furniture and vents clean, working and undamaged
-
Radiator fitted and level
-
Powerpoints clean and level
-
Window cill level and finished to a high standard
-
Light fittings and switches clean and working
External Doors, Glazing and Frames
-
All doors, doorframes, windows, glazing, arch formers cleared of mastic, debris and cleaned
Final Building Disinfection
-
PPE worn: Gloves, overshoes, MicroBan 1500 oversuit, FFP3 mask and full face visor
-
All door furniture treated with anti-viral solution and allowed 5 minute soak before wiping with blue roll
-
All door contact surface treated with anti-viral solution and allowed 5 minute soak before wiping with blue roll
-
All flat surfaces treated with anti-viral solution and allowed 5 minute soak before wiping with blue roll
-
All tiled, porcelain and stainless surfaces treated with anti-viral solution and allowed 5 minute soak before wiping with blue roll
-
Front door closed and sealed with tamper evident closure