PIR
-
Site conducted
-
Conducted on
-
Prepared by
-
Sketch Map
Contract Information
-
Contract/Reference Number
-
Contracting Parties
- Financier
- Client
- Collateral Manager
-
Financier
-
Client
-
Collateral Manager
-
Nature of Commodities
1) Storage Facility Location and Contact Details
-
Country
-
City/Town/Area
-
Street and Number
-
Co-ordinates
-
Distance From City Centre(km)
-
Distance From Port(km)
-
Place of CMI Executing Office
-
Facility Contact Person
-
Facility Telephone Number
-
Facility Email Address
2) Unit Construction
Walls
-
Walls: Any signs of damp, cracks, infiltration?
-
Additional Notes:
-
Overall Condition Grading Scale
Roof
-
Roof: Any signs of leakage?
-
Additional Notes:
-
Overall Condition Grading Scale
Structural Support
-
Structure Support: Any sign of fatigue?
-
Additional Notes:
-
Overall Condition Grading Scale
Floor
-
Floor: Is the level higher or lower than surrounds?
-
Additional Notes:
-
Overall Condition Grading Scale
-
Drainage
-
Drainage: Any signs of blockages or water pooling?
-
Is internal drainage system available
-
Additional Notes:
-
Overall Condition Grading Scale
Access
-
Are the doors the only access points to the facility construction?
-
Additional Notes:
-
Overall Condition Grading Scale
Doors
-
Number of doors to facility:
-
Are all doors lockable?
-
Are all doors sealable
-
Additional Notes:
-
Overall Condition Grading Scale
Ventilation
-
Type of Ventilation
-
Fumigation system/process in place and working?
-
Additional Notes:
-
Overall Condition Grading Scale
Internal Lighting:
-
Type of lighting
-
Is lighting adequate for stock taking purposes?
-
Additional Notes:
-
Overall Condition Grading Scale
Storage Space
-
Net storage space (square metres)
-
Net storage space (metric tonnes)
-
Additional Notes:
-
Overall space & capacity Grading Scale
3) Safety Assessment
Fire Equipment
-
Quantity of Fire Extinguishers
-
Type of Fire Extinguishers
-
Extinguishers Expiry Date
-
Sprinkler System available?
-
Fire alarm available?
-
Fire fighting plan/ training available?
-
Were any explosives/ Chemical hazards noticed?
-
General fire risk
-
Distance (km) to the nearest fire fighting station?
-
Additional Notes:
-
Overall Fire Security Grading Scale
Security
-
Who holds keys to locks of the facility?
-
Are keys locked securely away?
-
Is there a comprehensive alarm system installed?
-
is there a comprehensive CCTV system installed?
-
Is there a road/rail/both connection?
-
Secureness of connections:
-
Is there manned guarding?
-
Describe manned guarding:
-
Describe perimeter construction
-
Perimter secureness:
-
Is there control at premises access gate?
-
Who performs access control?
-
Access control efficiency?
-
Describe any additional security measures:
-
Overall Security Grading Scale:
Housekeeping:
-
Standard of exterior housekeeping:
-
Standard of interior housekeeping:
-
Additional Notes:
4) Human Resource
-
Staffing level (facility staff)
-
Any expat management?
-
Describe operational hours and days
-
Any activities subcontracted? Describe:
-
Additional Notes:
-
Overall Staffing Grading Scale:
5) Equipment
Handling equipment available
-
Forklifts?
-
Cranes?
-
Conveyor belts?
-
Other:
-
Condition of handling Equipment:
-
Additional Notes:
Weighing Equipment
-
Weighbridge?
-
Platform Scale?
-
Bag Scale
-
Other:
-
Condition of weighing equipment
-
Are all weighing equipment calibrated?
-
Describe scheduled calibration intervals of weighing equipment:
-
Expiry date of current calibrated weighing equipment:
-
Additional Notes:
6) Ownership and Insurance
-
Who is the facility owner?
-
Who is the facility manager?
-
Describe any lease agreements in place at the warehouse:
-
Is there any other collateral manager active at the warehouse: (Describe If yes)
-
How is the facility and content insured? (Describe all covered)
7) Summary
Risks identified and appropriate mitigation:
-
1. Risk
-
Mitigation
-
2. Risk
-
Mitigation
-
3. Risk
-
Mitigation
-
4. Risk
-
Mitigation
-
5. Risk
-
Mitigation
-
The facility is suitable for CMI service scope requirements:
-
The facility is approved for safe storage of cargo
-
Conditions to fix:
-
If applicable, next inspection and review date:
Signatures
-
Date of inspection of this report:
-
Inspection performed by:
-
Designation:
-
Signature
Management Approval
-
Date:
-
Name:
-
Designation:
-
Signature:
-
Disclaimer: '* This storage facility inspection performed by CMI is limited to a visual inspection only, aiming to verify/identify the existence of suitable conditions to storage of goods into the facility. Therefore, this storage facility inspection report may under no circumstances be considered as a technical inspection report that could have certified the facility construction conditions and/or its integrity as well as the current conditions of its structure. This document is issued only for CMI internal purpose. CMI makes no representations as to the accuracy, adequacy and/or completeness of any information contained in this document. CMI accepts no liability for the consequences of any action taken or not taken on the basis of this document.