PIR

  • Site conducted

  • Conducted on

  • Prepared by

  • Sketch Map

Contract Information

  • Contract/Reference Number

  • Contracting Parties

  • Financier

  • Client

  • Collateral Manager

  • Nature of Commodities

1) Storage Facility Location and Contact Details

  • Country

  • City/Town/Area

  • Street and Number

  • Co-ordinates
  • Distance From City Centre(km)

  • Distance From Port(km)

  • Place of CMI Executing Office

  • Facility Contact Person

  • Facility Telephone Number

  • Facility Email Address

2) Unit Construction

Walls

  • Walls: Any signs of damp, cracks, infiltration?

  • Additional Notes:

  • Overall Condition Grading Scale

Roof

  • Roof: Any signs of leakage?

  • Additional Notes:

  • Overall Condition Grading Scale

Structural Support

  • Structure Support: Any sign of fatigue?

  • Additional Notes:

  • Overall Condition Grading Scale

Floor

  • Floor: Is the level higher or lower than surrounds?

  • Additional Notes:

  • Overall Condition Grading Scale

Drainage

  • Drainage: Any signs of blockages or water pooling?

  • Is internal drainage system available

  • Additional Notes:

  • Overall Condition Grading Scale

Access

  • Are the doors the only access points to the facility construction?

  • Additional Notes:

  • Overall Condition Grading Scale

Doors

  • Number of doors to facility:

  • Are all doors lockable?

  • Are all doors sealable

  • Additional Notes:

  • Overall Condition Grading Scale

Ventilation

  • Type of Ventilation

  • Fumigation system/process in place and working?

  • Additional Notes:

  • Overall Condition Grading Scale

Internal Lighting:

  • Type of lighting

  • Is lighting adequate for stock taking purposes?

  • Additional Notes:

  • Overall Condition Grading Scale

Storage Space

  • Net storage space (square metres)

  • Net storage space (metric tonnes)

  • Additional Notes:

  • Overall space & capacity Grading Scale

3) Safety Assessment

Fire Equipment

  • Quantity of Fire Extinguishers

  • Type of Fire Extinguishers

  • Extinguishers Expiry Date

  • Sprinkler System available?

  • Fire alarm available?

  • Fire fighting plan/ training available?

  • Were any explosives/ Chemical hazards noticed?

  • General fire risk

  • Distance (km) to the nearest fire fighting station?

  • Additional Notes:

  • Overall Fire Security Grading Scale

Security

  • Who holds keys to locks of the facility?

  • Are keys locked securely away?

  • Is there a comprehensive alarm system installed?

  • is there a comprehensive CCTV system installed?

  • Is there a road/rail/both connection?

  • Secureness of connections:

  • Is there manned guarding?

  • Describe manned guarding:

  • Describe perimeter construction

  • Perimter secureness:

  • Is there control at premises access gate?

  • Who performs access control?

  • Access control efficiency?

  • Describe any additional security measures:

  • Overall Security Grading Scale:

Housekeeping:

  • Standard of exterior housekeeping:

  • Standard of interior housekeeping:

  • Additional Notes:

4) Human Resource

  • Staffing level (facility staff)

  • Any expat management?

  • Describe operational hours and days

  • Any activities subcontracted? Describe:

  • Additional Notes:

  • Overall Staffing Grading Scale:

5) Equipment

Handling equipment available

  • Forklifts?

  • Cranes?

  • Conveyor belts?

  • Other:

  • Condition of handling Equipment:

  • Additional Notes:

Weighing Equipment

  • Weighbridge?

  • Platform Scale?

  • Bag Scale

  • Other:

  • Condition of weighing equipment

  • Are all weighing equipment calibrated?

  • Describe scheduled calibration intervals of weighing equipment:

  • Expiry date of current calibrated weighing equipment:

  • Additional Notes:

6) Ownership and Insurance

  • Who is the facility owner?

  • Who is the facility manager?

  • Describe any lease agreements in place at the warehouse:

  • Is there any other collateral manager active at the warehouse: (Describe If yes)

  • How is the facility and content insured? (Describe all covered)

7) Summary

Risks identified and appropriate mitigation:

  • 1. Risk

  • Mitigation

  • 2. Risk

  • Mitigation

  • 3. Risk

  • Mitigation

  • 4. Risk

  • Mitigation

  • 5. Risk

  • Mitigation

  • The facility is suitable for CMI service scope requirements:

  • The facility is approved for safe storage of cargo

  • Conditions to fix:

  • If applicable, next inspection and review date:

Signatures

  • Date of inspection of this report:

  • Inspection performed by:

  • Designation:

  • Signature

Management Approval

  • Date:

  • Name:

  • Designation:

  • Signature:

  • Disclaimer: '* This storage facility inspection performed by CMI is limited to a visual inspection only, aiming to verify/identify the existence of suitable conditions to storage of goods into the facility. Therefore, this storage facility inspection report may under no circumstances be considered as a technical inspection report that could have certified the facility construction conditions and/or its integrity as well as the current conditions of its structure. This document is issued only for CMI internal purpose. CMI makes no representations as to the accuracy, adequacy and/or completeness of any information contained in this document. CMI accepts no liability for the consequences of any action taken or not taken on the basis of this document.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.