Internal Partitions & Celings : Spec & Inspection Q&A
Partitions - Boarding
-
Closure cert issued by the Main Contractor.
-
The correct type of boards used as per drawings & specs to both sides of the partition.
-
Correct drywall screws length are used for each layer of board installed
-
Correct acoustic insulation installed in partitions as per spec and secured in place?
2nd Fix of MF ceiling
-
Void Closure cert issued by the Main Contractor?
-
Ceilings are boarded using the correct boards as per drawings & specs?
-
Correct number of fixings installed as per the Manufacturers Installation Guide.
Skim finish
-
Corner / Stop beads installed correctly and plumb.
-
Plasterboard joints on Partitions & Ceilings are filled as per the Manufacturers Installation Guide.
-
Tape & Joint / SkimCoat installed as per the Manufacturers Installation Guide.
Waste management
-
1 - Debris and waste cleared out
-
2 - Work area cleaned
-
3 - Waste segregated as per guidelines
-
Any other issues?