Information
-
Conducted on
-
Prepared by
-
Project
-
Client
1. PROJECT MANAGER SAFETY CHECK LIST
-
1.1. Is the Risk Assessment / Method Statement live and has it been communicated with signage recorded?
-
1.2. Is there a signed safety policy with other appropriate company policies in place?
-
1.3. Do you have adequate facilities to maintain paperwork & safely store materials on site?
-
1.4. Are toilet & canteen facilities adequate with a water supply of drinking & hot water?
-
1.5. Have all Codge operatives been safety inducted by the Principal Contractor?
-
1.6. Have the SPA been completed? Signage Recorded?
-
1.7. Are Project Access arrangements adequate?
-
1.8. Are there physical hazards? Give details & attach photos.
-
1.9. Are working at height arrangements adequate?
-
2.0. Are GA2 / GA3 records Complete?
-
2.1. Are Housekeeping arrangements adequate?
-
2.2. Are temporary lighting / power supply arrangements adequate?
-
2.3. Are all employees wearing appropriate PPE?
-
2.4. Is safety signage adequate?
-
2.5. Are Toolbox talks taking place with subject literature attached?