Information

  • Conducted on

  • Prepared by

  • Project

  • Client

1. PROJECT MANAGER SAFETY CHECK LIST

  • 1.1. Is the Risk Assessment / Method Statement live and has it been communicated with signage recorded?

  • 1.2. Is there a signed safety policy with other appropriate company policies in place?

  • 1.3. Do you have adequate facilities to maintain paperwork & safely store materials on site?

  • 1.4. Are toilet & canteen facilities adequate with a water supply of drinking & hot water?

  • 1.5. Have all Codge operatives been safety inducted by the Principal Contractor?

  • 1.6. Have the SPA been completed? Signage Recorded?

  • 1.7. Are Project Access arrangements adequate?

  • 1.8. Are there physical hazards? Give details & attach photos.

  • 1.9. Are working at height arrangements adequate?

  • 2.0. Are GA2 / GA3 records Complete?

  • 2.1. Are Housekeeping arrangements adequate?

  • 2.2. Are temporary lighting / power supply arrangements adequate?

  • 2.3. Are all employees wearing appropriate PPE?

  • 2.4. Is safety signage adequate?

  • 2.5. Are Toolbox talks taking place with subject literature attached?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.