Title Page
-
Conducted on
-
Prepared by
-
Location
-
Asset label in place?
-
Is the door handle secure and not damaged inside and out?
-
Is the runner and guides smooth and not damaged?
-
Are the door hinges secure with no damage?
-
Is the door seal free from damage and fitted to the door frame with no gaps?
-
Do the door heaters work and free from ice and moisture?
-
Are the inner doors fitted and free from damage, If no have you raised a P3 for fabric to attend?
-
(If applicable) Are all sirens and warning lights working with manual test switch?
-
Do all lights work in cold room, If no have you raised P3 for IST?
-
Are there no gaps in the insulation and ceiling is not bowing?
-
Is the evaporator clear of ice and clean ?
-
Are all fans working and guards secure with no gaps over 15mm?
-
Is the floor free of water leaks and drain line clear?
-
Is earth bonding in place and secure on drain line?
-
Is the underfloor heater working in frozen room?
-
Are PRVs clear of ice in frozen coldroom?
-
Have you locked off control panel?
-
Is the panel wiring free from damage and faults?
-
Are fans and side panels free from ice build up and fan blades clean?
-
Are all terminal boxs IP rated, undamaged and glands fitted?
-
Have you removed your lock off?
-
Are all defrost heaters and drain line heaters working?
-
Are all probes in the correct place?
-
Is the TEV superheat set correctly?
-
Have you refitted all end panels, guards and closed the control panel?
-
Is the cold room communicating with the front panel?
-
Have P3s been logged for any defects found?
-
Confirm all of the above is correct.