Commercial Project Survey

  • Client company name

  • Site name

  • Conducted on

  • Conducted by

  • Location

Site contact

Site contact

  • Site contact name

  • Their role / Job title

  • Telephone Number

  • Email

Logistics

  • - Are there any times where site deliveries cannot be made? (Yes/No)

  • Can the site contact be used as a contact point to take deliveries and liaise with 3rd party contractors (scaffolders etc) prior to site team arrival date?

  • Are site welfare facilities available for engineers' use throughout installation?

  • What are the facilities available to the operatives (e.g. toilets and canteen)?

  • Is secure storage available on site for pre-install deliveries?

  • Who is the site contact for taking in deliveries?

  • What is the location of the storage solution?

  • Is 7.5t vehicle access achievable?

AC Electrical

  • Import meter(s) location (describe and mark on site plan)

  • Photos of import meter(s) - make sure to capture meter serial number and MPAN

  • Photos of DNO main fuse showing fuse rating

  • DNO connection voltage

  • Is there a transformer on site? (Describe and mark on site plan)

  • Is it owned by the client or the DNO?

  • Is there more than one transformer?

  • Photos of Substation/Transformer enclosure from outside (particularly any signage)

  • Photos of Transformer (particularly the nameplate and any other signage)

  • Photos of HV schematic on the wall

  • Photos of HV switchgear

  • Lv switch room photos

  • Is there a backup generator on site?

  • Is there a UPS system on site?

  • Is there a Voltage Optimiser?

  • Is there existing generation?

  • Existing DNC

  • Photos of main LV panel (including test certs, close-up of main breaker, and any spare ways)

  • Photos of LV schematic

  • Final connection method to sites electrical equipment

  • Photos of existing LV switchgear and where connection is to be made

  • Does the LV panel have surge protection? (add photos)

  • LV panel earthing arrangement

  • Inverter location proposed (describe and mark on site plan)

  • Inverter location photos

  • Cable route from inverter to final connection description

  • Cable route from inverter location to final connection point photo

DC Electrical

  • DC Cable Route Description

  • DC Cable Route Photos

  • Cable Penetration to building (description & photos)

Roof

  • Roof Type for installation:

  • What type of membrane?

  • Add measurements of crown width & distance between crowns

  • What is width between seams?

  • Is there a Lightning Protection System?

  • Maintenance provider details

  • Roof pitch estimate - degrees from horizontal

  • What is the condition of the roof where the PV is being installed?

  • What is your estimate of the roof height, from ground to ridge? (metres) Please add photo with something to scale e.g. doorway/car

  • Is an adequate roof access method already in place?

  • Is adequate fall protection already in place across the entire install area?

Roof access

  • What is the proposed roof access method for installation staff?

  • What is the location?

  • What is the proposed roof access method for materials?

  • What is the location?

  • What is the recommended fall protection for this installation?

  • Handrails

  • Where does edge protection need to be added?

  • Does any existing mansafe need recertifying?

  • Please mark inverter, transformer, incomer, Main LV panel, storage and access locations on a Google Earth image

Battery

  • Is a battery being considered?

  • Location description & photos

  • Description of requirements / ambition

  • Is EPS quote required?

Please add any further comments here

  • Further information

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.