Title Page

  • Site Attended

  • Site Location

  • Conducted on

  • Prepared by

Switchboard Inspection

  • Switchboard ID Number

  • Location
  • Photo

  • Point of Supply Location

  • Main Earth Compliant (Stake Depth, Label, Correct Lid, Location)

  • As Constructed Drawings Installed

  • All Circuits Installed & Labelled Correctly

  • Grouted & Sealed to Relevant Standard

  • Further Action Required?

Pit Inspection

  • Site ID Number

  • Location
  • Installed as per As Constructed Drawings

  • Pit & Lid Condition

  • Pit Surround Installed and Compliant

  • Conduits Trimmed & Sealed

  • Conduit Cover and Height from Bottom of Pit

  • Draw Rope Installed

  • Cable Slack Length

  • Cable Labelled Correctly

  • Cleanliness Inside Pit

  • Further Action Required

Pole Inspection

  • Pole ID Number

  • Grouted to Relevant Standard

  • Installed as per As Constructed Drawings

  • Pole Orientation Correct and Level

  • Ragbolt at Correct Height with Sufficient Thread

  • Correct Equipment Installed (Luminaire, Traffic Signals)

  • Correct Terminations

  • Further Action Required?

Audit Completion

  • Were there any items that couldn't be accessed?

  • Please List Access Requirements

  • Completed by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.