Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Observation Criteria
-
Is the scaff-tag appropriately displayed at the entry point to the scaffold indicating its status for use
-
Has the scaffold been inspected for the current period, weekly as a minimum
-
Are cables and leads suspended from the scaffold supported on insulated hanger/hooks
-
Is the loading on the scaffold in conformance to the scaffold rating (light, medium or heavy) duty stage
-
Is the scaffold appropriately tied in
-
Is the scaffold appropriately supported on sole boards
-
Ladders secured, 1.4 metre lean, project 1 metre above platform
-
Clear access egress points to scaffolds
-
Sharp edges and scaffold clips covered on walkways