Title Page
-
Date Commissioning Conducted
-
Commissioning Document Prepared by
Job Completion
-
Batch Unit Job Number
-
Axiom Job Number:
-
All motors Terminated to High voltage
-
All Scale cables ran from load cells to summoning boards
-
Rotations checked in sync with all other rotational loads
-
Rice lake control panel operating properly
-
E-Stop Functioning Properly
-
Service Receptacle installed by panel
-
Horn audible (Min 100 feet in any direction)
-
All Ty-Wraps Cut off Flush
-
All Overloads Set
-
Scale Cable Used (In Feet)
-
Water Meter Setting
-
Is there any ship loose components being sent with the unit?
-
Where is it located.
-
Special notes for customer/end user:
-
Picture of Completed unit.
-
Picture of Completed Panel.
-
Signature of electrical contractor:
-
Signature of Axiom Representative
Motor Currents
-
Main System Voltage
-
Auger 1 FLA
-
Auger 1 HMCP Setting
-
Auger 2 FLA
-
Auger 2 HMCP Setting
-
Conveyor Belt FLA
-
Conveyor HMCP Setting
-
Water Pump FLA
-
Air Compressor FLA
-
Vibrators FLA
-
Is there a Hydraulic Pump?
-
Hydraulic Pump FLA