Foundations, Structures ETC,
-
Project
-
Conducted on
-
Foundation Number
-
Date of Placement
-
Drawing No.
-
Revision No.
-
Mix Design
Discipline Approval Signatures - As Required
-
Forms
-
Steel
-
Plumbing
-
Labor
-
Piping
-
Mechanical
-
Electrical
-
Instrumentation
-
Engineering
-
Other
Checklist Items (Initial, Date, Remarks)
-
Company Representative Notified of Placement Date
-
Approved Supplier and Mix Design
-
Curing and Protection
-
Casing For Drilled Pier Onsite
-
Hot and Cold Weather Concreting
-
Excavation Depth and Size
-
Suitable Drilled Excavation
-
Forms -Line & Grade, Braced, Correct Dimensions
-
Reinforcing Steel - Correct size, Splicing, Clearances and Spacing
-
Anchor Bolts Correct Protective Coating, Size and Location
-
Joints, Chamfer Installed Per Details
-
Concrete Delivery Ticket Inspected
-
Placement and Consolidation Correct
-
Maintain Tremie Depth Within the Concrete Pour
-
Quality Testing Onsite for Testing
-
Comments
-
Sub-Contractor (Company)
-
Sub-Contractor (Signature)
-
Sub-Contractor (Date)
-
Contractor (Company)
-
Contractor (Signature)
-
Contractor (Date)