Site Info

  • Project

  • Client

  • Date

  • Reviewer

  • Date of Drilling/Excavation

  • Date of Placement

  • Drawing No.

  • Revision No.

  • Mix Design

  • Batch Plant Identifier

  • Batch Ticket Number(s)

Fence Details - Remarks, Initial, Date

  • Height of fence being installed (ft)

  • Gauge and type of fence?

  • Twisted and barbed finish along top and bottom selvedges?

  • Fabric ties gauge? Material?

  • Material type for post and rails?

  • Layout of fence per plans?

  • Embedment of post (ft)

  • Concrte finish and domed?

  • Alvarado Gate?

  • Layout of gates and dimensions per plans?

  • Bottom of elevation of fence mesh per elevations on plans?

  • Security cabling?

  • Cable clip bolt threads being burred per specs?

  • Terminating cables at terminal post?

  • Cable taut not tension?

  • Additional Comments:

  • Subcontractor - Company

  • Subcontractor - Signature

  • Subcontractor - Date

  • Contractor - Company

  • Contractor - Signature

  • Contractor - Date

  • Owner Rep/Testing/Inspector - Company

  • Owner Rep/Testing/Inspector - Signature

  • Owner Rep/Testing/Inspector - Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.