Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Confin 1&2 Creels: Has the lot been clearly identified on machines?
-
Confin 1 & 2: Is the machine set up correct for the lot and records complete?
-
Confin 1 hard twist: Has the titration test been completed as per standard and within specification? (if running)
-
Confin 1 & 2: Are the regain checks completed to standard and within specification?
-
Confin 1 & 2: Have the lots been wrapped and identified correctly?<br>
-
Confin 1 & 2: Pallet weights and pallet numbers and all information correct on tickets? (Ignition match D365 labels)
-
Are all chemicals i.e. prod chems, paints, solvents & cleaners stored correctly and labelled correctly? (Check Confin Chem Store)
-
Is the spill kit securely sealed, easily accessed and in good condition?
-
Are all drains covered and free from waste/fibre/yarn?