Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1st Fix
-
Core Board Fitted Correctly
-
Mastic/Fire Strip To Core Board Complete
-
Deep Track Fitted To Core Board And Screwed Correctly To Head
-
Shallow Track Fitted To Floor/Sole Plate And Screwed Correctly
-
Tracks Folded To Door Openings
-
Studs Fitted With Deflection Space
-
Studs Spaced Correctly 300/400/600 Centre
-
Flat Plate Fitted To Studs And Correct Height
-
Door Timbers Fitted To Doors
-
Correct Board Type Fitted
-
Boards Staggered / Deflection Applied
-
Boards Screwed @ 300 Centres
-
Boards Screwed @ 200 Centre To Corners / Doors
-
Board Bottoms Screwed To Floor Tracks
-
Doors Correct Width / Height
-
Rips Added To 2nd Side
-
Gypliner Added Over Concrete And Fitted Correctly
-
Add signature