Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - Internal External Angles
-
1.1 - Paper Tape Applied Correctly
-
1. 2 - Paper Tape Not Peeling Off
-
1. 3 - Angle Beads Stapled And Plumb
-
1. 4 - Stop Beads To Window
2. 0 - Plasterboard Surface
-
2. 1 - Joins Coated Correctly
-
2. 2 - Screws Filled Including Around Doors
-
2. 3 - Areas Filled From Windows Or Corners
-
2. 4 - No Bubbles Visable
-
2. 5 - Windows / Frames Cleaned From Filler
-
2. 6 - Floor / Corner Excess Filler Removed From Walls
3. 0 - Sanding Down / Dust Mask Required
-
3. 1 - Walls & Ceilings Sanded Down Correctly Including Dust From Corners
4. 0 - Window Reveals Sanded Into Corners And Filled Out Fully
-
4. 1 - Window Reveals Plumb & Square
-
4. 2 - Equal Margin Achieved Around Windows
-
5. 1 - Floors Swept
-
5. 3 - No Materials / Empty Bags / Sand Paper
-
5. 4 - Temporary Any Temp Protection<br>
6. 0 - Primer / Sealer Coat
-
6. 1 - Primer Evenly Applied To Walls / Ceilings
-
6. 2 - Primer Applied To Corners And Internal Angles
-
Operative's signature
-
Conneely Management signature