Audit

1.0 - Screw centres

1.1 - Boards screwed up @ 300mm centres

1.2 - Door jambs screwed up @ 200mm centres

1.3 - External corners screwed up @ 200mm centres

1.3 - Screws not too proud or sunk too deep

2.0 - Studs

2.1 - Studs set out correctly

2.2 - Studs @ correct deflection

2.3 - Party wall studs in place and braced

2.4 - Sacrificial walls studs in place

3.0 - Boards

3.1 - Boards @ correct deflection

3.2 - Door edges and external corners surfed

3.3 - Correct type of boards used

4.0 - Flat plate

4.1 - Flat plate @ correct height

4.2 - Flat plate tek screwed to studs correctly

4.3 - Flat plate screwed up through boards

4.4 - No joins in between studs

5.0 - Mastic

5.1 - Mastic bead applied to core board

5.2 - Mastic bead applied to floor track

5.3 - Mastic bead applied to abutment studs to columns

6.0 - Setting out

6.1 - Walls set out correctly as per architect's drawings

6.2 - Fire compartment maintained

7.0 - Letterbox

7.1 - Letterbox formed correctly

7.2 - Letterbox lined with plasterboard

7.3 - Letterbox cut out

8.0 - Waste

8.1 - Debris and waste cleared out

8.2 - Plot swept out

8.3 - No Boxes of screws and other consumables left in plot

Sign Off
On site representative
Auditor's signature
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.