Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - Internal and external angles
-
1.1 - Paper tape applied correctly
-
1. 2 - Paper tape not peeling off
-
1. 3 - Angle beads plumb
-
1. 4 - Trim not showing
2. 0 - Plasterboard joins and surface
-
2. 1 - Joins coated correctly
-
2. 2 - Screws are not showing
-
2. 3 - No bumps on the walls or ceiling
-
2. 4 - No bubbles visible
-
2. 5 - Socket cut outs cleaned from filler
-
2. 6 - Snots removed from walls
3. 0 - Sanding down
-
3. 1 - Walls and ceilings sanded down correctly
4. 0 - Window reveals
-
4. 1 - Window reveals plumb and square
-
4. 2 - Equal margin achieved
5. 0 - Waste
-
5. 1 - Snots scraped from the floor
-
5. 2 - Window frames cleaned
-
5. 3 - No materials or rubbish left in the plot
-
5. 4 - Temporary protection removed
6. 0 - Primer
-
6. 1 - Primer evenly applied
-
6. 2 - Primer applied to corners and internal angles correctly
-
Operative's signature
-
Conneely Management signature