Information

  • Document No.

  • Audit Title

  • Wates / Greenwich Peninsula

  • Conducted on

  • Prepared by

  • Greenwich Peninsula London
  • All site Team

Inspection check list

Activity: Pre-installation inspection.

  • Check the plot sign off sheet at entrance of plot has been completed by previous trades & signed off by Wates.

  • Check the area is clear of materials and debris.

  • Check screed installation for levels and movement.

  • Check screed to patio doors and full height windows is complete.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: Installation of laminate / engineered floor finishes.

  • Check the area is clear of materials and debris.

  • Check perimeter gaps are 5-10mm. MAXIMUM

  • Check levels and movement particularly noise when under pressure.

  • Check levels and movement at full height windows base.

  • Check cover trim has been fitted with tight joints and firm.

  • Check columns and floor sockets have been finished with correct gaps.

  • Check front entrance door base has been completed and firm.

  • Check correct setting out to kitchen and floor has been laid voids and spaces.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: installations of protection.

  • Check the area is clear of materials and debris.

  • Check protective underlay is laid to perimeter walls.

  • Check hardboard protection is laid to within 50mm of the perimeter walls and is fully taped down on all joints.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

Activity: final inspection and sign off.

  • Check all items which require action as above have been corrected.

  • Completed plot sign off sheet at plot entrance and ensure BHCL carry out sign off inspection.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.