Audit Title: Kitchen Inspection
-
Kitchen Type
- Alno
- Manhattan
-
Plot
-
Block
- Block A
- Block B
- Block C
- Block D
- D town house
- B town house
- 5 story town house
-
Level
- Ground Floor
- level 1
- level 2
- level 3
- level 4
- level 5
- level 6
- level 7
- level 8
- level 9
- Roof
-
Flat Ref
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Flat Type
- Social
- Private
- Intermediate
-
Wates / Greenwich Peninsula
-
Conducted on
-
Prepared by
Inspection check list
-
Is the correct kitchen installed to the apartment No.
-
-
Is the kitchen installed to the correct drawing and specification.
-
Damage ..Are there any chips, scratches or defects.
-
Are the wall units plumb.
-
Do all doors operate correctly.
-
Are all rubber stoppers installed to the doors.
-
Are correct screws used as per manufacturers instructions.
-
Are all hinges and screws in place.
-
Are al O&M manuals present.
-
Are worktops plumb.
-
Are plinths continuous.
-
Are all cuts to worktops pencil line and sealed.
-
Are all sink, tap and overflows sealed correctly.
-
Are all screw caps installed correctly and are the correct colour.
-
Any other comments.
-
Photos are available for this inspection or handover.
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.
-
Signed on behalf of Sub-Contractor
-
Signed on behalf of Main Contractor