Information

  • Document No.

  • Audit Title: Kitchen Inspection

  • Kitchen Type

  • Plot

  • Block

  • Level

  • Flat Ref

  • Flat Type

  • Wates / Greenwich Peninsula

  • Conducted on

  • Prepared by

Inspection check list

  • Is the correct kitchen installed to the apartment No.

  • Is the kitchen installed to the correct drawing and specification.

  • Damage ..Are there any chips, scratches or defects.

  • Are the wall units plumb.

  • Do all doors operate correctly.

  • Are all rubber stoppers installed to the doors.

  • Are correct screws used as per manufacturers instructions.

  • Are all hinges and screws in place.

  • Are al O&M manuals present.

  • Are worktops plumb.

  • Are plinths continuous.

  • Are all cuts to worktops pencil line and sealed.

  • Are all sink, tap and overflows sealed correctly.

  • Are all screw caps installed correctly and are the correct colour.

  • Any other comments.

  • Photos are available for this inspection or handover.

This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Sub Contractors responsibility until practical completion has been achieved.

  • Signed on behalf of Sub-Contractor

  • Signed on behalf of Main Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.