Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Inspection check list
-
Brickwork is to the standard and quality set out in the approved sample panel.
-
Blockwork is to the standard and quality set out in the approved sample panel.
-
Wall ties, l-shaped ties, head restraints and other steel sundries are installed correctly .
-
All horizontal and vertical DPCs are installed correctly and to specification.
-
Membranes, weep vents and/or air bricks are installed correctly.
-
Brickwork and blockwork is set out correctly to position, line and gauge.
-
All openings are correct to current drawings and have been set to the height and position required.
-
Have all cavities been cleaned and are free from debris.
-
Are all concrete or steel lintels installed correctly to position and height.
-
Are all heads, columns and other abutments of walls closed and sealed as per architects requirements.
-
DPCs are installed in the correct heights and positions.
-
Acceptance of trial panel
-
Air temp check +3C and rising
-
Visual inspection and picking of reclaimed bricks
-
Type of bond
-
Installation of reinforcing expanded metal meshwork
-
Position and installation of movement joints
-
Wall Thickness
-
Ground level change in brick
-
Type of pointing
-
Planter Coping Stone
-
Cladding ties and additional for top two course
-
Curing / Protection Method
-
Cleanliness of facing brick
-
Photos are available for this inspection or handover.
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining the sub-contractors responsibility until practical completion has been achieved.
-
Signed on behalf of Sub Contractor
-
Signed on behalf of Main Contractor