Title Page
-
Job Number
-
Address
-
Date
-
Prepared by
BOILER
-
Pipework cleaned of flux, using steel wool
-
Filling loop disconnected
-
Pipework straight and tidy
-
Pressure relief pipe sleeved
-
Pressure relief pipe returned to wall
-
Compartment stickers fitted
-
All manufacturers stickers removed
-
Pipe clips fitted
-
Heat mats used – no burn marks on wall
-
Plywood Pattress Fitted
-
Boiler Securely Fitted to substraight
PPE Equipment & Safety Signs
-
Is Hard Hats/Bump caps being worn
-
Is gloves being worn
-
Is Eye protection being worn
-
Is safety boots being worn
-
Is Saftey Barriers in use
-
Is safety signage displayed
-
Is fire extinguishers in the property
Delap Pictures of Building
-
Front Elevation
-
Gable's Photo's
-
Rear Photo's
-
Gas Meter Box Secured
Pre Installation
-
Boiler Location Photo
-
Existing boiler/Heaters/HWC Photo's
ASBESTOS
-
Is there asbestos in the property
-
Has asbestos been disturbed during works
-
If Disturbed, Has management been notified
VENTILATION
-
Does the appliance(s) being installed require ventilation
Working At Height
-
Tetra Trained
-
Ladder Inspection
-
Harness & Lanyard inspection
-
Rope inspection
Working in LOFT
-
Has Crawl Boards been used
-
Safe Access Egress
-
Is There Endangered Species present
FLUE
-
Has the potentential for 'Flues in voids' been addressed
-
Flue sealed both sides with cement/bonding
-
Flue joints screwed
-
Flue correct length – no white showing
-
Flue brackets fitted on each flue length
-
Correct flashing used/flue boot fitted
-
Fire plates fitted on inside cupboards on vertical flues
-
Analyser caps replaced
SYSTEM
-
All RADS in correct position
-
All fitting tight – no leaks
-
By-pass RAD fitted in same room as thermostat
-
Drain valve fitted on hall RAD/MT cock fitted externally
-
Room stat correct distance from by-pass RAD
-
Correct termination of condensate pipe
-
Boss Connector or Condensate Clamp for termination of condensate pipe
-
Pipework under kitchen sink checked for leaks
-
All water tanks & redundant pipework removed
-
Radiator pipe holes filled
GAS
-
Gas meter & pipework cleaned of flux
-
Gas pipework labelled with tape
-
Gas pipework sleeved through cavity’s
-
Pipework clipped correctly
-
Test Nipple on Gas Meter
-
ECV Valve Accessible
-
is Additional ECV valve required
HOUSEKEEPING
-
Carpets all replaced correctly
-
Carpets tucked in around all edges
-
Carpet bars all replaced and undamaged
-
All holes filled with correct filler (no silicone)
-
All carpets hoovered
-
All surfaces cleaned of dust
-
All rubbish removed from site internally/externally
-
All landings/communal areas cleaned
ELECTRICAL
-
Fused spur & controls fitted correctly
-
All controls fully operational
-
3-amp fuse fitted in spur
-
All controls fully explained to customer
-
All cables cut back & clipped
-
Cross bonding fitted on boiler paperwork
-
Gas meter bonded
-
Trunking used where possible
-
CO detector fitted
-
Correct heat/smoke alarms fitted
LITERATURE
-
All instruction manuals left in property
-
Benchmark completed
-
Boiler Serial Number Photo
-
CP12 Completed
-
Analyser Calibration in date
-
Analyser printout Attached
-
All documents signed
-
All photos taken
FGA Readings
-
PPM
-
CO2
-
CO/CO2
COMPLETION
-
Additional comments
-
Gas Engineer's Name and Signature
-
Joiner's Name and Signature
-
Electrician's Name and Signature
-
Tenant's Name and Signature
-
Supervisor Name and Signature