Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
OSHA Safety
-
Are workers wearing personal protective equipment where required?<br>
-
Is the work area kept clean and in a sanitary condition?
-
Are floor and wall openings marked appropriately?
-
Is scaffolding being utilized and if so is the footing sound and is the scaffold able to support without failure four times the maximum intended load?
-
Is the workspace free and clear of all tripping hazards?
-
Is the egress route clearly marked and clear of any obstructions?
-
Are any hazardous materials present on the job site and if so what and how much is present?
-
Is there any confined space operations taking place on the job site and if so is there an entry permit on site?
-
Is any welding taking place and if so has a hot work permit been issued?
Fire and Life Safety
-
Is a fire watch being utilized and is there proper documentation on site?
-
Is there a fire extinguisher within 50' in any direction on the job site and is it properly installed and labeled?
-
Is the fire alarm and sprinkler system in good operating condition?
-
Is the area free of signs of smoking?
-
Are exit signs clearly visible, easy to understand, and illuminating properly?
-
If trash chutes are utilized is there a trash chute safety plan on site and is the plan being adhered too?
-
Is there a fire safety program in place?
-
In buildings over 1 story in height is there at least one stairwell that can be used at all times?
-
Is there fire department access?
-
Are the fire hydrants related to the construction site free from any obstructions?
-
Are temporary walls separating occupied portions of the structure from construction at least 1 hour fire rated?
-
Are there safety caps on all fuel gas cylinders?
-
Are safety precautions being followed for all underground work?
-
Is a fully functional communications system in place and being used?
Infection Control Measures
-
What class of infection control is required for this job site?
-
Are temporary barriers in place and effective?
-
Has HVAC been properly modified?
-
Is the sticky walk-off mat in place and effective?
-
Is the negative pressure monitoring device working properly?
-
Is the anteroom constructed properly and functioning properly?
-
Are the HEPA filters being utilized as prescribed by the ICRA and maintained properly?
-
Is there demonstrated compliance with cover clothing as required by the ICRA?
-
Are efforts being made to minimize dust and debris in and around the job site?