Information
-
Site Name
-
Contractor
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Audit details
-
Audit conducted on contractor:
-
Contact person on site:
Administration
Letter of Good Standing
-
Is the Letter of Good Standing available on file?
-
Is the Letter of Good Standing up to date?
-
Expiry Date
Notification of Construction Work
-
Notification of Construction Work done in time?
-
When was it sent?
-
Proof that Notification of Construction Work been sent to Dept of Labour?
-
Was the above done for Demolition Work?
-
Was the above done for Asbestos Work?
Mandatory Agreements & Contractor Appointments
-
Mandatory Agreement and Contractor Appointment signed and in the file between Client and Contractor?
-
Mandatory Agreement and Contractor Appointment signed and in the file between Contractor and Sub-Contractor/s?
Acts and Regulations
-
Copy of the Occupational Health and Safety Act on file?
-
Copy of the Construction Regulation 2014 on file?
Health and Safety Management Plan
-
Is there a Health and Safety Plan in the file?
-
Is the plan, Site and Job Specific?
-
Has the plan been signed of by the Construction Manager / Supervisor?
-
Has the plan been approved?
-
Is there a list of Sub-Contractors that will be used?
-
Is there a Organogram in the plan / file?
Health and Safety Policy
-
Is there a Health and Safety Policy in the file?
-
Has the Policy been signed by the CEO/MD of the company?
-
Date it was signed - Not more than 1 year from current date
-
Has the Policy been communicated to all staff on site?
-
What was the last date it was communicated
Medicals - According to CR 2014
-
Does all workers have valid medicals - Annexure 3?
-
Does all plant and machinery operators have valid medicals - Annexure 3?
Induction & Visitors
-
Has all staff working on site been inducted?
-
Has all visitors to the site been inducted?
-
Is there a site visitors register and is it up to date?
Risk Assessment, Safe Work Procedures and Method Statements
Risk Assesment
-
Is there a Site and Job specific Risk Assessment?
-
Has all the Hazards and Risk Identified in the Risk Assessment?
-
Has all the Hazards and Risks been rated and scored?
-
Has the Risk Assessment been approved by the Construction Manager / Supervisor and signed off?
-
Has the Risk Assessment been Reviewed and Monitored by the appointed Risk Assessor?
-
Date the Risk Assessment was last reviewed
-
Has the Risk Assessment been approved by the client?
-
Has the Risk Assessment been communicated to all employees on site?
-
Date it was last communicated to employees
Safe Work Procedures and Method Statements
-
Is there Safe Work Procedures and Method Statements according to the Risk Assessment?
-
Has the Safe Work Procedures and Method Statements been reviewed?
-
Date when the Safe Work Procedures and Method Statements was last reviewed
-
Has the Safe Work Procedures and Method Statements been communicated to all employees on site?
-
Date the Safe Work Procedures and Method Statements was last been communicated to employees
Fall Protection Plan & Fall Rescue Plan
Fall Protection Plan
-
Is there a site and job specific Fall Protection Plan for all work being done in an elevated position?
-
Is there a Risk Assessment according to the risks identified by the Fall Protection Plan?
-
Has the Fall Protection Plan been approved by the Construction Manager / Supervisor?
-
Has the Fall Protection Plan been approved by the client?
-
Has the Fall Protection Plan been Reviewed and Monitored by the appointed Fall Protection Plan Developer?
-
Date the Fall Protection Plan was last reviewed
-
Is there Fall Arrest Equipment available on site according to the Fall Protection Plan?
-
Has the Fall Protection Plan been communicated to all employees on site?
-
Date the Fall Protection Plan was last communicated to all employees
Fall Rescue Plan
-
Is there a Fall Rescue Plan in the file?
-
Is the Fall Rescue Plan according to the risks identified in the Fall Protection Plan?
-
Is the Fall Rescue Plan sufficient for the work being done in an elevated position?
Incidents, Accidents and Emergency Procedures
Incidents and Accidents Procedures
-
Is there a Incident and Accident Procedure in the file?
-
Is there Annexure 1 forms available in the file?
-
Is there W.CL.2 forms available in the file?
-
Has the Incident and Accident Procedure been communicated to all employees on site?
-
Date when the Incident and Accident Procedure was last communicated to all employees
Emergency Procedure
-
Is the Emergency Procedure site specific?
-
Is the Emergency Numbers posted for all employees to have access to it?
-
Is there access to a telephone in case of an emergency on site?
-
Is there a First Aid Box available on site?
-
Has the Emergency Procedure been communicated to all employees on site?
-
Date when the Emergency Procedure was last communicated to all employees
Hazardous Chemical Substances
-
Is there MSDS's for all the HCS that are on site?
-
Has all employees been trained on the HCS and MSDS's that are on site?
-
Date when the HCS and MSDS's was last communicated to all employees
Environmental Management Plan
-
Is there an Environmental Management Plan in the file?
-
Has the Environmental Management Plan been approved by the client?
Appointments
Has the following been appointed in writing?
-
Delegation of Duties - 16.2
-
Proof of Competency?
-
Construction Manager - CR 8(1)
-
Proof of Competency?
-
Construction Supervisor - CR 8(7)
-
Proof of Competency?
-
Assistant Construction Supervisor - CR 8(8)
-
Proof of Competency?
-
Safety Officer (Full or Part Time) - CR 8(5)
-
Proof of Competency - Certificate
-
Risk Assessor
-
Proof of Competency - Certificate
-
Fall Protection Plan Developer
-
Proof of Competency - Certificate
-
Temporary Works Designer - CR 12(1)
-
Proof of Competency - Certificate
-
Temporary Works Supervisor - CR 12(2)
-
Proof of Competency?
-
Temporary Works Erector - CR 12(3)(a)
-
Proof of Competency?
-
Excavation Supervisor - CR 13(1)
-
Proof of Competency?
-
Demolition Supervisor - CR 14(1)
-
Proof of Competency?
-
Scaffold Erector - CR 16
-
Proof of Competency - Certificate
-
Scaffold Inspector - CR 16
-
Proof of Competency - Certificate
-
Scaffold Supervisor - CR 16
-
Proof of Competency?
-
Material Hoist Inspector - CR 19(8)
-
Proof of Competency?
-
Vehicle and Mobile Plant Inspector - CR 23
-
Proof of Competency?
-
Vehicle and Mobile Plant Operator - CR 23
-
Proof of Competency - Certificate
-
Electrical Installations and Machinery Inspector - CR 22
-
Proof of Competency - Certificate
-
Stacking and Storage Supervisor - CR 28
-
Proof of Competency?
-
Fire Equipment Inspector - CR 29
-
Proof of Competency?
-
Fire Fighter - CR 29
-
Proof of Competency - Certificate
-
Hazardous Chemical Substances Supervisor
-
Proof of Competency?
-
Lifting Machine Inspector - DMR 18
-
Proof of Competency?
-
Lifting Machine Operator - DMR 18
-
Proof of Competency?
-
Lifting Tackle Inspector - DMR 18
-
Proof of Competency?
-
Banksman / Slinger - GMR 4
-
Proof of Competency?
-
Flame Cutting / Welding Supervisor - GSR 9
-
Proof of Competency?
-
Incident Investigator - GAR 9
-
Proof of Competency - Certificate
-
First Aider - GSR 3
-
Proof of Competency - Certificate
-
Ladder Inspector
-
Proof of Competency?
-
Health and Safety Representative - OHS Sec 17
-
Proof of Competency - Certificate
-
Hand Tool Inspector
-
Proof of Competency?
-
Portable Electrical Tool Inspector
-
Proof of Competency?
Registers and Checklists
-
Fire Equipment
-
Date last checked
-
First Aid Box
-
Date last checked
-
-
Date last checked
-
Hand Tool Register
-
Date last checked
-
Daily - Portable Electrical Tool Register
-
Date last checked
-
Ladder Register
-
Date last checked
-
Daily - Excavation Register
-
Date last checked
-
Demolition Register
-
Date last checked
-
Daily - Temporary Works Register
-
Date last checked
-
Daily - Material Hoist Register
-
Date last checked
-
Daily - Vehicle and Mobile Plant Checklist
-
Date last checked
-
Scaffold Checklist
-
Date last checked
-
Daily - Compacting Equipment Checklist
-
Date last checked
-
Welding and Flame Cutting Register
-
Date last checked
-
Fall Protection Equipment Checklist
-
Date last checked
-
Stacking and Storage Checklist
-
Date last checked
-
Lifting Tackle - Monthly Register
-
Date last checked
-
Lifting Tackle - Quarterly Inspection Checklist
-
Date last checked
-
Lifting Tackle - Load Test Certificate
-
Date of last load test
-
Lifting Equipment - Monthly Register
-
Date last checked
-
Lifting Equipment - 6 Monthly Inspection Checklist
-
Date last checked
-
Lifting Equipment - Annual Load Test Certificate
-
Date of last load test
-
Electrical Distribution Boards
-
Date last checked
-
Health and Safety Representative Monthly Checklist
-
Date last checked
Physical Inspection / Audit
Site Inspection / Condition
-
Barricading of site or areas
-
Control of Traffic and Pedestrians
-
Ablution Facilities Adequate
-
Ablution Facilities Clean
-
Waste Removal Adequate - Bulk
-
Building Waste Removal Adequate - Bricks / Cement Bags
-
General Waste Removal Adequate - Papers / Bottles and other waste
-
Emergency Assembly Point Identified
-
Stacking and Storage on site
-
Tripping Hazards on site
-
Walkways and other paths
-
Excavations - Correctly Sloped
-
Excavations - Correctly Barricaded
-
Excavations - Excess Soil removed
-
Excavations - Ladders used
-
Excavations - Correct Warning Signs
-
Scaffolding - Signage (Safe or Unsafe for Use)
-
Scaffolding - Safe Access (Ladder)
-
Scaffolding - Fully Boarded
-
Scaffolding - Toe Boards in place
-
Scaffolding - Knee Rails in place
-
Scaffolding - Hand Rails in place
-
Scaffolding - Bracing Enough
-
Scaffolding - Signed Off by Scaffold Inspector
-
Lifting Equipment Numbered?
-
Date of last check / load test
-
Fire Fighting Equipment in good condition and working order
-
Date last serviced
-
Overall Hand Tools in good working order
-
Overall Portable Electrical Tools in good working order
-
Overall Ladders in good working order
-
PPE Compliance - Workers - Hard Hats
-
PPE Compliance - Workers - Safety Shoes
-
PPE Compliance - Workers - Reflective Vests
-
PPE Compliance - Workers - Other (Safety Glasses / Ear Protection)
-
PPE Compliance - Site Management - Hard Hats
-
PPE Compliance - Site Management - Safety Shoes
-
PPE Compliance - Site Management - Reflective Vests
-
PPE Compliance - Visitors - Hard Hats
-
PPE Compliance - Visitors - Suitable Protective Shoes
-
General Bricklaying Methods
-
General Plastering Methods
-
General Concrete Pouring Methods
-
General Reinforcing Steel Work Methods
-
General Painting Methods
-
General Welding Operations
-
General Material Handling Methods
-
General Stacking and Storage
-
Traffic Control - Is there enough signage?
-
Traffic Control - Is the signage sufficient?
-
Traffic Control - Is the signage in good condition?
-
Traffic Control - Is it effective?
-
Traffic Control - Is provision made for pedestrians?
-
General Demolition Methods
-
General Working at Heights
Safety Audit Sign Off
-
Health and Safety Officer - Rijon Stoop
-
Date and time signed off