Project/Site Information
-
Project Description
-
Site conditions during the assessment
-
Building Construction
-
Occupied Building
-
Expected labour levels (low and peak)
-
Persons especially at risk from fire?
-
Other information
Untitled Page
-
Identification of Hazards
If yes is selected, risk reduction Control Measures must be completed and reflected in the project fire plan.
Combustible materials
-
Are there suitable waste disposal and management programmes in place?
-
Is the fire load of the project being managed?
-
Are waste storage facilities located a safe distance from ignition sources?
-
Are flammable substances or goods stored on site (i.e. gas, LPG, liquids etc.)? If so, are they being stored safely.
-
Is fuel being stored safely on site?
-
Are general house keeping acceptable and not contributing fire loads?
-
Other?
Sources of ignition
-
Is there a hot works permit management system in place?
-
Is smoking being controlled?
-
Are temporary electrical supplies being used and managed?
-
Are there testing and inspection regimes of portable electrical appliances?
-
Do welfare arrangements and equipment pose a fire risk?
-
Are generators in use and being managed?
-
Other?
Emergency Procedures
-
Has an adequate fire alarm system been installed?
-
Are fire points positioned strategically across site?
-
Is there a means of fire or smoke detection (where appropriate and without creating a high risk of false alarms)?
-
Are written emergency procedures / plans displayed in prominent locations across the site?
-
Has a fire safety coordinator been appointed on the project and are they suitably trained?
-
Has a fire drill been completed?
-
Does the site induction include fire safety procedures?
-
Are fire safety measures on site being proactively monitored and managed?
-
Other?
Escape and protection
-
Are there adequate means of escape throughout site?
-
Where dead-end situations exist, have they been subject to special attention?
-
Have travel distances for means of escape been considered and reduced to as low as reasonably practicable?
-
Where external escape stairs have been constructed, do these comply with the requirements of HSG168?
-
Has an assembly point been identified and been published?
-
Is there clear fire escape and exit signage located throughout the site?
-
If applicable, have water supplies for firefighting been considered?
-
Has emergency lighting provision been considered within staircases etc?
-
Where flexible protective coverings are used, do these conform to the requirements of LPS1207?
-
Where flexible materials are used to clad scaffolding, do these confirm to the requirements of LPS1215?
-
Other?
Fire Doors & Spread
-
Are fire doors present and in good working order?
-
Is compartmentation of good standard (holes, pipes, service penetrations - horizontal and vertical) ?
-
Other?
Portable fire extinguishers
-
Are there adequate numbers of extinguishers on site?
-
Are extinguishers positioned strategically (emergency routes and exits) and are they accessible?
-
Have extinguishers been serviced annually in line with BS5306-?
Site security against arson
-
Is the site suitably secured to prevent unauthorised access?
-
Are waste and combustible materials stored away from the site boundary?
-
Other?
Temporary site buildings
-
Are temporary buildings separated from the building under construction or refurbishment to provide as wide fire-break as possible?
-
Are temporary buildings constructed from materials which do not significantly contribute to the growth of fire or the propagation of smoke?
-
Where temporary buildings and welfare facilities are installed within the building under construction, has fire safety and management been considered?
-
Do fire exits from temporary buildings / accommodation lead directly to the open air and away from the structure?
-
Other?
External risks and hazards e.g. arson.
-
Does the project pose any significant fire risk to existing occupiers, adjacent properties and / or 3rd parties?
-
Do existing occupiers, adjacent properties and or 3rd parties pose a significant fire risk to the project?
Overall Risk
-
At the time of the site visit and assessment, we make the following risk calculation (please note, these assessments are a snap shot of the site, in the condition it was found in and the information gathered during our visit):
-
Risk of a Fire Starting:
-
Risk of a Fire Spreading:
Assessment Details
-
Assessed By (Name, Signature & Review Date)
-
Position
-