Information

  • Location
  • Principal contractor

  • Appointing contractor

  • Conducted on

  • Greenmount Projects Ltd Contractor/Site Manager

  • Greenmount Projects Ltd Site Supervisor

  • Number of Greenmount Projects Ltd operatives on site

  • Sub Contractor Company Name & Numbers of operatives on site.

  • Description of Works

Previous Audit Report

  • Has the previous audit report been closed out?

Site Set up

  • Are the following items displayed?

  • Latest H&S Policy?

  • Employers and Public Liability Insurance?

  • Asbestos Report?

  • First aid location signs?

  • Medical emergency plan?

  • Assembly point signs?

  • No Smoking signs?

  • Health & Safety Law poster ( what you should know)?

Management Controls

  • Check that a copy of Form 10 is displayed on site.

  • Ensure site safety rules are displayed in a prominent position e.g. reception, canteen, site office etc.

Construction Phase Plan

  • Does the CPP display the correct start and completion dates?

  • Does the CPP display the correct names of appointed persons?

  • Does the CPP display the correct address's for site and supporting locations?

Health and Safety Management

  • Has the H & S site set up checklist been completed?

  • Is there weekly H & S audits in place (internal)

  • Is there monthly H & S audits in place (external)

  • Is the site diary regularly filled in and well maintained?

  • Is the sign in/out register maintained?

Risk Assessments and Method Statements (Contractor or Sub-Contractor)

  • Name of Contractor or Sub Contractor on Site to Complete Spot Audit

  • Ensure all Greenmount Projects Ltd Risk Assessments & Method Statements have been prepared by a competent person and have been checked, reviewed and signed.

  • Ensure all Sub Contractor Risk Assessments & Method Statements have been prepared by a competent person and have been checked, reviewed and signed.

  • Are method statements adequate and suitable for the task?

  • Ensure all contractors are working in accordance with the method statement.

Induction

  • Induction process to include the induction register complete and individual induction forms (with all boxes filled in with the correct information)

  • Ensure all staff receive a site specific safety induction before starting work (permanent operatives and visitors)

Access and Egress

  • Are stairwells clear and accessible?

  • Edge protection & handrails installed (if stairwells aren't complete)

  • Is there safe access and egress to all working areas of the site?

  • Are walkways free from obstructions and stored materials?

  • Are access routes adequately lit (permanent or artificial lighting)?

  • Are lifts (internal & external) operational and available for use?

Access - External

  • Ensure all public access routes are kept clean and clear at all times.

  • Ensure there are suitable barriers and warning notices to keep members of the public separated from the site works and site traffic.

  • Is there lockable doors/gates for site security?

  • Ensure the site is securely fenced or alternative measures in place, at all times to prevent unauthorised access.

Control of Substances Hazardous to Health (COSHH)

  • Have COSSH Assessments been carried out for all potentially hazardous materials and substances being used on the site.

  • Are material safety data sheets available to assist with COSHH assessments.

  • Some substances require to be controlled, in locked/secure containers/cages. Items should be assessed against, operatives, surrounding risks/hazards and the environment itself.

  • Are COSHH materials suitably controlled on site.

Dust

  • Are any work processes creating high levels of dust?

  • Is there suitable control measures in place to manage dust? (vacuum systems, extraction, dampening)

  • Is there materials on site that require the mixing of the solution? Is this carried out safely, preferably externally in clean air?

Electrical Equipment

  • Greenmount Projects Ltd are responsible for the testing of Greenmount electrical items only. It is the responsibility of all sub contractors to ensure any equipment used on site is PAT tested and maintained, prior to commencing any works. The client is responsible for any electrical items left for use for the duration of works (welfare equipment)

  • Are all electrical items PAT Tested?

  • Check that low voltage tools and equipment are being used wherever possible.

  • Ensure that cables and trailing leads are not trip hazards.

Fire Risks and Management

  • Fire risk and management should be the responsibility of all those on site. But ultimately, managed by the appointed contracts manager. Consultation with the client appointed responsible person should be carried out to clarify any issues that may arise from project works. This is to include changes to active and passive fire protection systems, works that may impede escape routes, existing fire evacuation plans and any other items that may affect the existing fire risk assessment.

  • Is there a fire risk assessment in place?

  • Is there any breach/bypass in passive fire protection? If so has the responsible person been informed?

  • Has a fire action plan been produced?

  • Has a fire emergency plan been produced?

  • Is there appointed fire marshals within the building?

  • Check that there is an adequate means of raising the alarm, and that it is regularly tested.

  • If the existing fire detection and warning is disabled, is there secondary means in place and is it suitable to the site?

  • Extinguishers should be of the correct type for the classification of fire and hazards within the working area.

  • Check that suitable fire extinguishers are provided and that they are maintained and in good condition and have had an annual inspection.

  • Is the escape route designated (plan and signage) and is it clear and accessible?

First Aid

  • Ensure a new style Accident Book (which complies with the Data Protection Act) is provided on site and is available to all personnel

  • Check the number of first aiders required, this is dependent on the type of work or operations, the number of workers on site and any special or unusual hazards.

  • Are the names of first aiders detailed on the site notice boards?

  • Ensure the first aid kit contains only first aid materials.

Housekeeping

  • Is waste well managed throughout the day with regular clean ups? Safely stored in bags, bins, trucks?

  • Ensure all debris and waste is removed from the work area upon completion of the work or at the end of each shift.

  • Are site materials and equipment safely stored? No slip, trip or fall hazard? No toppling of stacked materials?

Low Level Access Including Steps and Podiums

  • Are steps class 1 as defined in EN131?

  • Have ladders received a pre use inspection?

  • Have ladder works been authorised and permits issued?

  • Do all ladders display tags with date and signature of competent person?

  • Are podiums used before steps are allowed?

  • Are podiums free from defects?

Manual Handling

  • Ensure that a manual handling risk assessment has been completed wherever regular lifting of heavy loads is required.

  • Greenmount Projects Ltd are responsible for the maintenance of manual handling training for their operatives only. It is the responsibility of sub contractors to ensure their operatives are fully trained in safe manual handling techniques prior to commencing any works.

  • Ensure all staff have received manual training for heavy or repetitive lifting operations and certification is on site?

Mobile Scaffold Towers & Mobile Elevated Working Platforms (MEWPS)

  • Check that propietary tower scaffolds have been erected and are being used in accordance with the suppliers instructions.

  • Check that the wheels of any tower scaffold have been locked when in use and check that the platform is empty when being moved.

  • Are they tagged safe for use?

  • Are MEWPs in good condition and subjected to daily before and after use checks?

  • Are MEWPs used on safe ground and cordoned when in use?

  • Do operatives hold the appropriate qualification for use?

  • Are MEWP inspection records kept and well maintained.

Occupational Health, HAV'S, Noise and Associated Health Risks

  • Has the Operative undertaking vibration works received HAV Training

  • Greenmount Projects Ltd are responsible for the maintenance of HAVS awareness training for their operatives only. It is the responsibility of sub contractors to ensure their operatives are fully trained in HAVS awareness prior to commencing any works.

  • Noise - As a general rule, if you: - have to shout to be heard at a distance of 2m, the noise level is approx 85dB and you should consider wearing hearing protection.

  • - have to shout to be heard at a distance of 1m, the noise level is approx 90dB and you should definitely wear hearing protection.

  • Check whether the noise can be reduced by using different working methods or selecting quieter plant e.g.: by fitting breakers and other plant or machinery with silencers.

  • Ensure that people not involved in the work are kept away from the source of the noise.

Personal Protective Equipment (PPE)

  • Is all P.P.E well maintained, undamaged and fit for use prior to works commencing?

  • PPE General Requirements - Ensure PPE compatibility issues have been considered and that one piece of PPE not restrict the effectiveness of another piece of PPE.

  • Ensure all staff and visitors are wearing Hi-Viz vests or jackets.

  • Eye Protection

  • Are operatives wearing eye protection and ensure that it is of a suitable grade for the type of work being undertaken. I.e. light protection or full goggle etc.

  • Foot Protection

  • Ensure that footwear is fitted with steel toecaps and steel sole plates.

  • Hand Protection - Ensure that where damaged to the hands may occur through activities such as handling, or when using hazardous substances/chemicals that all persons affected wear the appropriate class of safety glove.

  • Ensure gloves are correct for their application and the activity being undertaken.

  • Hearing Protection

  • Ensure the correct type of protection is in use for the task.

  • Respiratory Protection (RPE) - Avoid the use of nuisance dust masks.

  • Ensure that the correct type of respiratory equipment is used for the works being undertaken and ensure that persons are trained for the use of the RPE and where applicable have a face fit test to ensure the effectiveness of the RPE.<br>

  • Safety Helmets

  • Ensure all staff and visitors are wearing safety helmets.

Plant & Equipment

  • Ensure that tools and equipments are stored correctly to avoid damage to the equipment and persons. (Tool bags/boxes, site boxes)

  • Power Tools

  • Ensure that the tools are in a good state of repair and carries appropriate safety symbol e.g. BS kite mark, CE Mark etc and do not have loose cables etc.

  • Check that tools are 110 volt and that a residual current device (RCD) is used for additional protection.

  • Plant

  • Ensure all Plant and Machinery is inspected on a weekly basis by a competent person and recorded in a Plant Inspection Register.

  • Are all plant operators trained and hold a valid plant operators card for the categories being operated?

Permits

  • Are hot works being carried out and are permits issued?

  • Are works at height being carried out and are permits issued?

  • Are electrical works being carried out and are permits issued?

  • Are all permits closed after use?

Registers and Records

  • Check the site Inspection Registers for items such as scaffolding, MEWPs, plant and other equipment have been completed in a timely fashion.

Scaffolding/Working Platforms

  • Check that any scaffold erection, alteration or dismantling is carried out by a competent person.

  • Check that working platforms are fully boarded and that the boards are arranged to avoid tipping or tripping - i.e: no overlapping boards.

  • Are access towers/fixed scaffolds erected to the correct standard and are hand rails etc fitted as per the standards?

  • Are all openings on scaffolding protected from falls?

  • Do all ladder accesses have self-closing gates fitted?

  • Ensure that there are effecting warning notices in place to stop any person using an incomplete scaffold.

Training and Skill Cards (General)

  • Training and skills cards are retained at Greenmount Projects Ltd head office and retained for records. Co-ordination for re-training of operatives is managed by HR. Sub contractors are responsible for their own operatives and should provide all evidence of training and skills cards prior to commencing works.

  • Are Skill Cards available for inspection? i.e. CSCS/CPCS/PASMA/IPAF

  • Any operatives not holding or providing the appropriate training and skills card, should be held from carrying out works until evidence has been submitted.

Tool box talks

  • TBT are delivered to operatives when required and deemed necessary by site managers. TBT's will ensure operatives are regularly updated with changes in laws, changes to company policy and procedures, site specific risks, client requirements and compliance and general health and safety relating to the construction industry.

  • Ensure appropriate Tool Box Talks are given to all employees and that the Tool Box Talks are appropriate and relevant to the work being undertaken.

  • Do all operatives who attend sign onto the TBT register?

Waste Management

  • Waste records are monitored and retained at Greenmount Projects Ltd head office.

  • Is a waste management plan in place and suitable?

  • Are external skips are an acceptable level?

  • Are recyclable skips available and are they correctly filled?

Welfare Facilities

  • Ensure a facility is provided to change, dry and store clothing.

  • Mess facilities should include a place where workers can sit, make hot drinks and prepare food.

  • Mess facilities shall be of sufficient size for the number of employees on site and are provided with heating.

  • Ensure access to the welfare facilities are accessible to all persons on the site.

  • Ensure a supply of wholesome drinking water and cups are provided with signage

  • Ensure sufficient toilets are readily available, maintained, kept clean & are properly lit.

  • Ensure there are washbasins, hot and cold running water, soap and towels.<br>

  • Are welfare facilities cleaned on a daily basis?

Working at Height

  • Roof Work

  • Ensure that edge protection is provided to stop people or materials falling.

  • Ensure that people are kept away from areas below the roof work.

  • Ladders

  • Ensure that ladders are in good condition, are not split, warped or have damaged rungs etc.

  • Check that ladders are secured to prevent them slipping sideways or backwards.

  • Check that ladders rise a sufficient height above their landing place (approx. 1m or 5 rungs).

  • Harness Use.

  • Do operatives that are working on scaffolds have double harnesses as per the site requirements?

  • Are harnesses clipped on where required?

  • Edge Protection

  • Are edge protection measures in place throughout site?

Other information

Sign off

  • I confirm I have had the contents of this audit report explained to me.

  • Site Manager

  • Person conducting this Audit.

  • Audit concluded at:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.