Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Site manager
-
Location
Site Set Up
Part 1: CPP
-
Is the CPP in the site file? (hard copy)
-
Does the CPP detail correct start and completion dates?
-
Does the CPP detail correct names of appointed persons?
-
Does the CPP detail correct detail correct address’s and supporting locations?
-
Has the CPP been provided to the client and been accepted?
-
Has the client provided their own CPP and is it retained in the site file?
-
Have all parts of the CPP been signed by the required persons?
Part 2: Risk Assessments/Method Statements
-
Are the Greenmount Project Ltd RA/MS in the site file?
-
Are Greenmount Project Ltd RA’s detailed and applicable to all site works?
-
Referenced under Section 4
-
Are Greenmount Project Ltd MS’s detailed and applicable to the site programme of works?
-
MS should detail each phase of works, and where applicable sub contractors should be referenced to their phase of works and MS.
-
Have all Greenmount Project Ltd operatives signed onto the RA/MS register?
-
Have all Sub – Contractor RA/MS been reviewed by the site Contract Manager?
-
Are all Sub – Contractor RA/MS in the site file?
-
Are Sub - Contractor RA’s detailed and applicable to all site works?
-
Are Sub - Contractor MS’s detailed and applicable to their site works?
-
Have all Sub - Contractors operatives signed onto their respective RA/MS register?
-
Have all Sub – Contractors provided electronic and hard copies of RA/MS?
-
Failure to provide a hard copy on the first day should result in refusal of site access and any immediate works.
Part 3: Inductions
-
Paper induction records and register in the site file?
-
Induction records are fully filled in with all information?
-
Qualification cards to be provided at point of induction?
Part 4: Site/Legal Board
-
A Complete H&S Law Poster displayed?
-
F10 Notice to HSE on notice displayed?
-
Employer’s insurance displayed.
-
Greenmount Projects Ltd H & S policy displayed?
-
Fire Evacuation Plan displayed?
-
First Aider details displayed?
-
Emergency procedure with telephone numbers displayed?
Part 5: Site Signage
-
Are site safety rules clearly displayed at the entrance to site?
-
Warning signage on the external of site?
-
Warning signage on the internal of site?
-
MEWP operations signage in place?
-
First Aid signage?
Part 6: Permits
-
Does the client have their own permit system to be used during the project and has it been issued?
-
Are hot work permits in the site file?
-
Are permits to work issued?
-
Are work at height permits in the site file?
-
Are ladder permits in the site file?
-
Are electrical permits in the site file?
-
Are dig permits in the site file?
Part 7: COSHH
-
Have Greenmount Projects Ltd issued COSHH assessments for all site materials?
-
Have Greenmount Projects Ltd issued MSDS assessments for all site materials?
-
Have all Sub – Contractors issued COSHH assessments for all site materials?
-
Have Sub – Contractors issued COSHH MSDS for all site materials?
-
Are all materials collectively recorded on the COSHH register?
Part 8: Site Management
-
Signing in/out register in site office?
-
Site diary in the site office?
-
Inspection sheets in the site file?
-
H & S audits stored in site file?
Part 9: Ladders
-
Ladder pre – use inspection sheets in site file?
Part 10: MEWPS
-
MEWP handover certificates in the site file?
-
MEWP inspection sheets (weekly) in the site file?
-
MEWP Operations signage on site?
-
MEWP Operations barriers on site?
Part 11: Scaffold
-
Scaffold handover certificate is in the site file?
-
Scaffold inspection tags displayed?
-
Scaffold signage is displayed?
-
Access ladders are secured in place?
-
Scaffold exclusion zones established at ground level?
Part 12: Waste
-
Waste skips in designated area?
-
Recyclable skips clearly designated?
-
Waste receipts retained in site file?
Part 13: Site Security
-
Site security sufficient?
-
Site manager details available for any security issues?
-
Key holder/Client security information in CPP?
Part 14: Site Access/Egress & Traffic Plans
-
Clear access/egress routes throughout site?
-
Pedestrian walkways established?
-
Pedestrian crossing points in place near roadways?
-
One-way systems in place?
-
Vehicle passing points and turning areas in place?
-
Onsite speed limits clearly displayed?
-
Traffic management plan displayed?
-
Appointed banksman?
Part 15: Welfare
-
Suitable mess huts with tables and seating (Not Benches) & drying room facilities for the maximum number of persons expected on the project.
-
Means of preparing and heating food (Microwave)
-
Means of storing perishables (fridge)
-
Means of boiling water (instant hydra boil)
-
Drinking water / not drinking water signs
-
Site and Office Toilets for Male, Female, and disabled personnel (office)
-
Hand towels / dryers
-
Barrier cream/liquid soap/re-conditioning cream/ sun cream/after care cream/Swarfega
-
Heaters
-
Clothes hooks
-
Power and utility supplies connected and sufficiently buried/guarded.
-
Toilet rolls, hand wipes, liquid Soap, hand towels, washing up liquid, detergent, bleach, urinal blocks, air freshener, kitchen cleaner
-
Have all personnel access to welfare facilities?
Part 16: Fire
-
Building FRA in place?
-
Fire evacuation/emergency plan in site file?
-
Fire Action Plan displayed?
-
CO2 Extinguisher on site?
-
Water Extinguisher on site?
-
Foam Extinguisher on site?
-
Dry Powder Extinguisher on site?
-
Wet Chemical Extinguisher on site?
-
Fire detection in place and active?
-
Fire warning system in place and active?
-
Secondary warning system?
-
Assembly/Muster points in place.
-
Are escape routes designated? Signage in correct places?
-
Fire Marshal details displayed.
Part 17: First Aid
-
First Aider information and details displayed?
-
First Aider to operative ratio sufficient?
-
First Aid kits provided and accessible?
-
AED availability?
-
Accident book on site?