Information

  • Site Location
  • Principal contractor

  • Client

  • Conducted on

  • Greenmount Projects Ltd Contract

  • Greenmount Projects Ltd Site Manager

  • Total number of operatives on site

  • number of subcontractors on site

  • Description of Works

Previous Audit Report

  • Has the previous audit report been closed out?

Site Set up

  • Are the following items displayed?

  • Latest H&S Policy?

  • Employers and Public Liability Insurance?

  • Asbestos Report?

  • First aid location signs?

  • Are assembly point details communicated to site operatives?

  • Have all site operatives been informed that smoking and vaping on site is prohibited

  • Health & Safety Law poster ( what you should know)?

Management Controls

  • Check that a copy of Form 10 is displayed on site.

  • Ensure Site Rules are displayed in a prominent position e.g. reception, canteen, site office etc.

  • Has the Greenmount Roles and Responsibilities Matrix been completed and all parties informed

Construction Phase Plan

  • Does the CPP display the correct start and completion dates?

  • Does the CPP display the correct names of all CDM Duty Holders?

  • Does the CPP include full and up to date subcontractor list?

  • Does the CPP display the correct site address?

Health and Safety Management

  • Has the H & S site set up checklist been completed?

  • Are H & S audits being carried out by both Contract and Site Managers?

  • Are there monthly H & S audits in place (external)

  • Is the site diary regularly filled in and well maintained?

  • Is the sign in/out register maintained?

Risk Assessments and Method Statements ( Sub-Contractor)

  • Name of Sub Contractor RAMS being audited

  • Is the author of subcontractor RA/MS noted on the document?

  • Have they been signed by all ops on site

  • Have they been reviewed by Greenmount appointed person (site manager/contracts manager)?

  • Are method statements adequate and suitable for the task?

  • Are contractors working in accordance with the method statement?

Risk Assessment and Method Statements (Greenmount)

  • Has the Project Method Statement been completed and retained on site safety file?

  • If GP are required to undertake works, have all associated method statements and risk assessments been created for the works and retained on the site safety file?

  • Have the RAMS been briefed and signed by relevant operatives?

Induction

  • Induction process to include the induction register complete and individual induction forms (with all boxes filled in with the correct information)

  • Has the GP site induction presentation been completed and on site?

  • Is the induction site specific?

  • Have all site personnel been inducted?

Access and Egress

  • Is there safe access and egress to all working areas of the site?

  • Are edge protection & handrails installed (if stairwells aren't complete)?

  • Are stairwells clear and accessible?

  • Are walkways and corridors free from obstructions and stored materials?

  • Are access routes adequately lit (permanent or artificial lighting)?

  • If applicable, are lifts (internal & external) operational and available for use?

Access - External

  • Are all public access routes in and around the site kept clean and clear at all times?

  • Are there suitable barriers and warning notices to keep members of the public separated from the site works and site traffic.

  • Is access onto the site secure and/or securable?

  • Is the site securely fenced or alternative measures in place, at all times to prevent unauthorised access?

Control of Substances Hazardous to Health (COSHH)

  • Is the GP COSHH Register retained on site (hard copy/electronically)?

  • Have all subcontractors provided COSHH Data for products being used on site?

  • Some substances require to be stored in locked/secure containers/cages.

  • Are all control measures in place for the storage of COSHH products?

Dust

  • Are any work processes creating high levels of dust?

  • Are there suitable control measures in place to manage dust? (vacuum systems, extraction, dampening)

  • For cement, plaster and similar materials require mixing, are there adequate controls in place?

  • Do all operatives have access to suitable RPE where required?

Electrical Equipment

  • Greenmount Projects Ltd are responsible for the testing of Greenmount electrical items only. It is the responsibility of all sub contractors to ensure any equipment used on site is PAT tested and maintained, prior to commencing any works. The client is responsible for any electrical items left for use for the duration of works (welfare equipment)

  • Are all electrical appliances and equipment PAT tested every 6 months?

  • Is all electrical equipment battery operated and/or 110v?

  • Are trailing leads managed so as to prevent tripping hazards?

Fire Risks and Management

  • Fire risk and management should be the responsibility of all those on site, but ultimately, managed by the appointed contracts manager. Consultation with the client appointed responsible person should be carried out to clarify any issues that may arise from project works. This is to include changes to active and passive fire protection systems, works that may impede escape routes, existing fire evacuation plans and any other items that may affect the existing fire risk assessment.

  • Have any breaches of fire compartmentation been identified?<br>(if not please indicate N/A)

  • If so, has the client been informed?

  • Has an emergency fire procedure been produced and displayed?

  • Is there an adequate means of raising the alarm?

  • Extinguishers should be of the correct type for the classification of fire and hazards within the working area. It is recommended that there is at least 1 x 9L Water or Foam extinguisher and 1 x CO2 extinguisher at each fire point.

  • Are extinguishers deployed on site in suitable locations?

  • Are they the correct type of appliance?

  • Has a logistics plan been produced incorporating all necessary safety information - access/egress, alert points, first aid locations and assembly point?

First Aid

  • Ensure a new style Accident Book (which complies with the Data Protection Act) is provided on site and is available to all personnel

  • Are there adequate first aiders on site to deal with site personnel numbers? (0-5 1No. one day first aider; 5-50 minimum 1 No. 3 day first aider)

  • Are the names of first aiders detailed on the site notice boards?

  • Have the contents of the First Aid box been checked for suitability and date as per inventory levels?

Housekeeping

  • Are work and storage areas clean and tidy?

  • Are site materials and equipment safely stored? No slip, trip or fall hazard? No toppling of stacked materials?

Low Level Access Including Steps and Podiums

  • Have all ladders/podiums been recorded in GP register?

  • Have all ladders and podiums in use been inspected and permit issued?

  • Are all ladders in use displaying a tag?

  • Are podiums used before steps are allowed?

Manual Handling

  • Greenmount Projects Ltd are responsible for the maintenance of manual handling training for their operatives only. It is the responsibility of sub contractors to ensure their operatives are fully trained in safe manual handling techniques prior to commencing any works.

  • Are operatives on site using good manual handling techniques?

  • Are there sufficient and suitable lifting aids available for use on site to reduce manual handling?

  • Is there any heavy or hazardous lifting on site which has not been adequately controlled?

Mobile Scaffold Towers & Mobile Elevated Working Platforms (MEWPS)

  • Have all/any propietary tower scaffolds have been erected and signed off by a competent person (PASMA) ?

  • Are the wheels of tower scaffolds locked out when in use and platform empty when being moved.

  • Is the tag displayed?

  • Are MEWPs in good condition and subjected to daily pre-use checks?

  • Are MEWPs used on safe ground and cordoned when in use?

  • Where applicable do operatives hold the appropriate qualification for use? (IPAF)

  • Are MEWP inspection records kept and well maintained.

  • Are "MEWP in Operation" warning signs displayed to alert all persons of MEWP activity?

Occupational Health, HAV'S, Noise and Associated Health Risks

  • Is the HAVS poster displayed for all operatives to see?

  • have subcontractors informed site management of all plant and electrical equipment on site to enable it to be assessed?

  • Greenmount Projects Ltd are responsible for HAVS awareness training for their operatives only. It is the responsibility of sub contractors to ensure their operatives are fully trained in HAVS awareness prior to commencing any works.

  • Noise - As a general rule, if you: - have to shout to be heard at a distance of 2m, the noise level is approx 85dB and you should consider wearing hearing protection.

  • - have to shout to be heard at a distance of 1m, the noise level is approx 90dB and you should definitely wear hearing protection.

  • Is noise properly controlled on site? e.g. isolated, suppressed or PPE worn

  • Ensure that people not involved in the work are kept away from the source of the noise.

Personal Protective Equipment (PPE)

  • Is all P.P.E well maintained, undamaged and fit for use prior to works commencing?

  • PPE General Requirements - Ensure PPE compatibility issues have been considered and that one piece of PPE not restrict the effectiveness of another piece of PPE.

  • Are all staff and visitors are wearing Hi-Viz vests or jackets?

  • Eye Protection

  • Are operatives wearing eye protection and ensure that it is of a suitable grade for the type of work being undertaken. I.e. light protection or full goggle etc.

  • Foot Protection

  • Are all site personnel wearing footwear fitted with steel toecaps and steel sole plates?

  • Hand Protection - Ensure that where damaged to the hands may occur through activities such as handling, or when using hazardous substances/chemicals that all persons affected wear the appropriate class of safety glove.

  • Are all gloves being worn on site correct for their application and the activity being undertaken.

  • Hearing Protection

  • Is the correct type of ear protection is in use for the task.

  • Respiratory Protection (RPE) - Avoid the use of nuisance dust masks.

  • Are all masks in use on site FFP3 filters?<br>

  • Have operatives who are wearing masks been face fit tested and are clean shaven?

  • Safety Helmets

  • Are all staff and visitors wearing safety helmets.

Plant & Equipment

  • Are tools and equipment stored correctly. (Tool bags/boxes, site boxes)

  • Plant

  • Is all Plant and Machinery inspected on a weekly basis ?

  • Are all plant operators trained and hold a valid plant operators card for the categories being operated?

Permits

  • Are hot works being carried out and are permits issued? (Daily)

  • Are works at height being carried out and are permits issued? (Weekly)

  • Are electrical works being carried out and are permits issued? (Duration of permit at discretion of site manager)

  • Are all permits closed after use?

Registers and Records

  • Have the site Inspection Registers for items such as scaffolding, MEWPs, plant and other equipment been completed correctly?

Scaffolding/Working Platforms

  • Is scaffold erection, alteration or dismantling carried out by a competent person?

  • Are working platforms fully boarded and boards arranged to avoid tipping or tripping - i.e.: no overlapping boards.

  • Are access towers/fixed scaffolds erected to the correct standard with hand rails etc fitted as per the standards?

  • Are all openings on scaffolding protected from falls?

  • Are warning notices in place to stop any person using an incomplete scaffold? (where applicable)

Training and Skill Cards (General)

  • Training and skills cards for GP ops are retained at Greenmount Projects Ltd head office and retained for records. Co-ordination for re-training of operatives is managed by HR. Sub contractors are responsible for their own operatives and should provide all evidence of training and skills cards prior to commencing works.

  • Are Skill Cards for large plant and access equipment available for inspection? i.e. IFORS/CPCS/PASMA/IPAF

  • Any operatives not holding or providing the appropriate training and skills card, should be held back from carrying out works until evidence has been submitted.

Tool box talks

  • GP site management will ensure that a minimum of 2 TBTs per month are deliver ed on site. Topics will be determined by the project management team and deemed suitable for site conditions and works being carried out.

  • Are Tool Box Talks given to all employees in line with company policy and recorded in site safety?

  • Do all operatives who attend sign onto the TBT register?

Waste Management

  • Waste records are monitored and retained at Greenmount Projects Ltd head office.

  • Are external skips are an acceptable level?

  • If recyclable skips are available, are they correctly filled?

Welfare Facilities

  • Is a facility provided to change, dry and store clothing.

  • Do mess facilities include a place where workers can sit, make hot drinks and prepare food.

  • Are mess facilities of sufficient size to cater for numbers on site?

  • Are drinking water and cups provided with signage

  • Are toilets readily available, maintained, kept clean & properly lit.

  • Are there wash basins, hot and cold running water, soap and towels.<br>

Working at Height

  • Roof Work

  • Is edge protection provided to stop people or materials falling?

  • Where necessary are areas below isolated so that people are kept away from falling materials etc..

  • Ladders

  • Are scaffold ladders are in a good condition; check for splits, warping or damaged rungs etc.

  • Are ladders secured to prevent them from slipping sideways or backwards?

  • Do ladders rise to a sufficient height above their landing place (approx. 1m or 5 rungs).

  • Harness Use.

  • Do operatives that are working on scaffolds have double harnesses as per the site requirements?

  • Are harnesses used when required?

  • Edge Protection

  • Are edge protection measures in place throughout site?

Other information

Sign off

  • I confirm I have had the contents of this audit report explained to me.

  • Site Manager

  • Person conducting this Audit.

  • Audit concluded at:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.