Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Site manager

  • Location

Site Set Up

Part 1: CPP

  • Is the CPP in the site file? (hard copy)

  • Does the CPP detail correct start and completion dates?

  • Does the CPP detail correct names of duty holders and project management persons?

  • Does the CPP detail correct addresses and supporting locations (if applicable)?

  • Has the CPP been provided to the client and accepted (if applicable)?

  • Has the client provided their own Pre-Construction Info and is it retained in the site file (if applicable)?

Part 2: Risk Assessments/Method Statements

  • Are the Greenmount Project Ltd RA/MS in the site file?

  • Are Greenmount Project Ltd RA’s detailed and applicable to all site works?

  • Are Greenmount Project Ltd MS’s detailed and applicable to the site programme of works?

  • Have all Greenmount Project Ltd operatives signed onto the RA/MS signature page/acknowledgement sheet?

  • Have all Sub – Contractor RA/MS been reviewed by the site Contract Manager?

  • Are all Sub – Contractor RA/MS in the site file?

  • Are Sub - Contractor RA’s detailed and applicable to all site works?

  • Are Sub - Contractor MS’s detailed and applicable to their site works?

  • Have all Sub - Contractors operatives signed onto their respective signature/acknowledgement sheet?

  • Have all Sub – Contractors provided electronic and hard copies of RA/MS?

  • Failure to provide a hard copy on the first day should result in refusal of site access and any immediate works.

Part 3: Inductions

  • Are there induction records and accompanying register in the site file?

  • Are induction records completed for all site operatives with all relevant information?

  • Have copies of relevant accreditations been provided to site management at point of induction?

Part 4: Site/Legal Board

  • is the H&S Law Poster displayed?

  • F10 Notice to HSE on notice displayed?

  • Employer’s insurance displayed.

  • Greenmount Projects Ltd H & S policy displayed?

  • Fire Evacuation Plan/Procedure displayed?

  • First Aider details displayed?

Part 5: Site Signage

  • Are site rules clearly displayed within the office and canteen?

  • Is the construction site safety sign displayed at entrance to site?

  • Is there warning signage displayed for public view?

  • Are there MEWP operations signage in place (where applicable)?

  • First Aid signage?

Part 6: Permits

  • Does the client have their own permit system to be used during the project and has it been issued?

  • Are hot work permits in the site file? (Issued daily)

  • Are permits to work issued?

  • Are work at height permits in the site file? (Issued weekly)

  • Are ladder permits in the site file? (Issued weekly)

  • Are electrical permits in the site file?

  • Are dig permits in the site file?

Part 7: COSHH

  • Is the Greenmount COSHH register on site (Electronic Format)

  • Have Greenmount Projects Ltd issued COSHH assessments for all site materials?

  • Have Greenmount Projects Ltd issued MSDS assessments for all site materials?

  • Have all Sub – Contractors provided COSHH information for their site materials?

  • Have Sub – Contractors issued COSHH MSDS for all site materials?

  • Have all assessments and COSHH information been collectively recorded on the COSHH register?

Part 8: Site Management

  • Signing in/out register in site office?

  • Site diary in the site office?

  • Inspection sheets in the site file?

  • H & S audits stored in site file? (where applicable or completed)

Part 9: Ladders

  • Is the ladder asset register and inspection sheet on site ?

Part 10: MEWPS and LIFTING EQUIPMENT

  • MEWP LOLER certificates in the site file?

  • MEWP inspection sheets (weekly) in the site file?

  • MEWP Operations signage on site?

  • MEWP Operations barriers on site?

  • Type of mechanical lifting equipment to be used on site eg telehandler, Bocker Lift, hoist, FLT etc.. (if applicable)

  • Are all LOLER certs provided with equipment?

  • Are pre-use checklists retained on site safety file?

  • Has plant operator provided his competency certification? Eg (IFORS, CPCS etc..)

Part 11: Scaffold

  • Scaffold handover certificate is in the site file?

  • Scaffold inspection tags displayed?

  • Scaffold signage is displayed?

  • Access ladders are secured in place?

  • Scaffold exclusion zones established at ground level?

Part 12: Waste

  • Waste skips in designated area?

  • Recyclable skips clearly designated? (where applicable)

  • Waste consignment notes retained in site file?

Part 13: Site Security

  • Is site security sufficient?

  • Site manager details available for any security issues?

  • Key holder/Client security information in CPP?

  • Where applicable is a telephone number provided for GP responsible person displayed for public?

Part 14: Site Access/Egress & Traffic Plans

  • Clear access/egress routes throughout site?

  • Pedestrian walkways established? (if required)

  • Pedestrian crossing points in place near roadways? (If required)

  • One-way systems in place? (If required)

  • Vehicle passing points and turning areas in place? (If required)

  • Onsite speed limits clearly displayed? (If required)

  • Traffic management plan displayed? (If applicable)

  • Appointed banksman?

Part 15: Welfare

  • Suitable canteen with tables and seating (Not Benches) & drying room facilities for the maximum number of persons expected on the project.

  • Means of preparing and heating food (Microwave)

  • Means of storing perishables (fridge)

  • Means of boiling water (instant hydra boil or kettle)

  • Drinking water / not drinking water signs

  • Site and Office Toilets for Male/Female

  • Hand towels / dryers

  • Barrier cream/liquid soap/re-conditioning cream/ sun cream/after care cream/Swarfega

  • Heaters

  • Clothes hooks

  • Power and utility supplies connected and sufficiently buried/guarded.

  • Toilet rolls, hand wipes, liquid Soap, hand towels, washing up liquid, detergent, bleach, urinal blocks, air freshener, kitchen cleaner

  • Have all personnel access to welfare facilities?

Part 16: Fire

  • Building FRA in place? (If required)

  • Fire evacuation/emergency procedure in site file?

  • Fire Action Procedure displayed?

  • GP will provide as a minimum extinguishers capable of dealing with Class A, B, C, D and Electrical Fires. Has this been achieved on site?

  • CO2 Extinguisher on site?

  • Water Extinguisher on site?

  • Foam Extinguisher on site?

  • Dry Powder Extinguisher on site?

  • Fire detection in place and active?

  • Fire warning system in place and active?

  • Secondary warning system?

  • Assembly/Muster points in place.

  • Are escape routes designated? Signage in correct places?

  • Fire Marshal details displayed.

Part 17: First Aid

  • First Aider information and details displayed?

  • First Aider to operative ratio sufficient?

  • First Aid kits provided and accessible?

  • Accident book on site?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.