Title Page

  • Compound Photo

  • Conducted on

  • Prepared by

  • TYPE OF INSPECTION

  • Location of Inspection
  • TESTING COMPANY

  • Switchboard details below are to include all switchboards on site. Ensure that the switchboard number is entered correctly. After each switchboard is entered select "Add Switchboard" to continue with entering switchboard details.

  • SWITCHBOARD DETAILS
  • SWITCHBOARD NUMBER

  • PHOTO OF SWITCHBOARD EXTERNAL

SWITCHBOARDS: INSTALLED TO AS/NZS 3012 CLAUSE 2.3

  • ALL SWITCHBOARDS ARE FIXED APPROPRIATELY?

  • LOCKABLE SWITCHBOARD AND ONLY MAIN SWITCH IS ACCESSIBLE?

  • RCD FITTED TO ALL REQUIRED CIRCUITS?

  • ALL RCDs ARE TESTED, AND TEST STICKER ATTACHED?

  • ALL CABLES ENTERING THE SWITCHBOARD ARE MECHANICALLY PROTECTED BELOW 1.2m?

  • DANGER “LIVE SWITCHBOARD” SIGNAGE?

  • EARTH ELECTRODE AND M.E.N CLEARLY LABELLED?

  • PICTURE OF EARTH ELECTRODE

LIGHTING: INSTALLED TO AS/NZS 3012 CLAUSE 2.7

  • Emergency lighting shall be provided in designated access and egress paths and directly above and in front of switchboards, on all demolition and construction sites where the general lighting requirements cannot be met using natural lighting. Such lighting shall allow safe access to and egress from the site.

  • IS EMERGENCY LIGHTING INSTALLED TO ILLUMINATE ALL ACCESS/EGRESS POINTS AND TO THE MUSTER POINT.

  • PHOTO OF NON COMPLIANT AREA.

  • DO ALL FLUORESCENT LIGHTING HAVE EITHER A DIFFUSES OF METAL GUARD?

GPO’S:

  • ARE ALL GPO’S ADEQUATELY SECURED?

  • ARE ALL GPO’S INSTALLED TO SUIT CONDITION? IE WEATHERPROOF OUTDOORS

  • ARE DOUBLE POLE GPO INSTALLED WHERE REQUIRED (TRAILER)?

CONSTRUCTION WIRING: INSTALLED TO AS/NZS 3012 CLAUSE 2.5

  • IS ALL TEMPORARY WIRING CLEARLY LABELLED WITH YELLOW AND BLACK CONSTRUCTION WIRING TAPE (NO GREATER THAN 3 METER INTERVALS)?

  • EXAMPLES

  • IS ALL WIRING SUITABLY MECHANICALLY PROTECTED?

  • IS ALL WIRING ADEQUATELY SUPPORTED?

  • DOES THE CABLE TRAY HAVE ‘LIVE CABLE” SIGNAGE ATTACHED?

COMPLETION

COMPLETION

  • Date inspection completed.

  • HAS THE INSPECTION PASSED?

  • REC NUMBER

  • I certify that the electrical installation, to the extent that it is affected by the electrical work, has been inspected to ensure it is electrically safe and is in accordance with the requirements of AS/NZS 3000 and any other standard applying to the electrical installation under the Electrical Safety Act 1998 and the Electricity Safety (Installations) Regulations 2009

  • Full Name

GENERAL NOTES

  • GENERAL NOTES

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.