Information
-
CONTRACTOR INDUCTION RECORD
-
High Street Mall Portadown
-
Conducted on
-
BTWShiells Rep name
-
Signature
-
Location
-
Contractor Representitive name
-
Has the supplier / contractor been inducted in
1.0 - Responsibilities
-
1.1 structure of contract
-
1.2 who they are responsible to on the site & take instructions from
-
1.3 Contractor's responsibility for the direct management of their own staff & others engaged by them.
-
1.4 Contractor's responsibility to induct their own staff / sub-contractors.
-
1.5 Contractor's responsibility to ensure their workforce wears I.D. Badges / security passes at all times
-
1.6 Contractor's responsibility to ensure compliance with site rules. (Explain: booking in/ expected behaviour)
-
1.7 Contractor's responsibility to inform their host prior to any site work operations being undertaken.
-
1.8 Contractor's responsibility to carry out risk assessments & method statements
2.0 - Emergency Procedures (Fire & Bomb Threat etc.)
-
2.1 - Raising the alarm.
-
2.2 - Evacuation warning indication. ( bells, siren: intermittent or continuous sounding etc.)
-
2.3 - Escape routes (assembly points & building re-entry signal)
-
2.4 - Additional procedures applicable to suppliers work.
3.0 - Office
-
3.1 Procedures for reporting an accident or incident.
-
3.2 First Aid provision (First Aiders, contact numbers etc)
-
3.3 Location & availability of medical centre etc.
4.0 Site Conditions / Restrctions
-
4.1 hand held tools shall be 110v (unless specific permission is obtained from proper property manager).
-
4.2 all work equipment shall be suitable for use and tested (PAT, calibration cents. etc)
-
4.3 Competent and trained staff only to use work equipment.
-
4.4 personal protective equipment (who supplies, and know areas that require
-
4.5 permit to work and other safe systems of work (requi
-
4.6 Hazardous Operations / Areas (known for hazards or special conditions).
-
4.7 Smoking arrangements (no smoking site, designated smoking areas).
-
4.8 Waste Management.
-
4.9 pollution/ discharge
-
4.10 Protected Areas.
-
4.11 Sensitive Issues.
-
4.12 Parking arrangements.
-
4.13 Security.
-
4.14 Access Restrictions
5.0 Welfare facilities
-
5.1 Toilets and washrooms (availability, location or contractor to provide).
I can confirm that I have been inducted and understand all of the above Sign Off
-
On site representative
-
Position
-
Select date
-
Auditor's signature
-
Position
-
Select date