Information

  • FIRST NAME/LAST NAME of Contractor/Contractor Company Name/Contractor Orientation Phase 2

  • Client Name / Rig Name Contractor will be deployed to

  • Conducted on

Section to be completed by BOS:

Site BOS Requirements

  • Contractor was oriented with the Site and Site Personnel

  • Contractor has the correct PPE on the job (White Hard Hat, Blue Coveralls, Fall Protection and SRL, Mask with cartridges, Impact Gloves, Safety Toed Boots, Eye Protection (Glasses), LOTO Kit, H2S monitor if applicable.

  • Contractor filled out a Pre Job Risk Assessment

  • Contractor filled out and reviewed HSE Site Plan.

  • Contractor has access to applicable SOPs for their Scope of Work.

  • Contractor was oriented with all BOS and Supporting Equipment

  • Contractor performed a Heavy Equipment Inspection and performed a competency evaluation. <br>

  • Contractor performed a LOTO Competency evaluation

  • Contractor was explained equipment servicing and commissioning audit requirements.

  • Contractor reviewed application and applicable customer specs and deliverables to include reporting and DFR.

  • Contractor has completed Phase 2 Orientation

Additional Comments

  • Add Additional Comments and Pictures if Needed

  • Comment
  • Comment

Signatures

  • Name of BOS Orientator

  • Name of Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.