Title Page
-
Site conducted
-
Codification: I-GPS106UK01-U
-
Conducted on
-
Advisor
-
Advisor signature
-
undefined
Project details
-
Project Reference:
-
Date and Time:
-
Role / Name Audited:
-
Activity / Location Assessed:
Performance Monitoring (provide the following details for the period covered by this Monthly Safety Assessment)
-
Total of Safety specific NCR’s (Major) raised:
-
Total of Safety specific NCR’s (Minor) raised:
-
Total opportunity for improvement SORs raised:
-
Total best practice SORs raised:
General Site Information
-
Detail works taking place on site at time of assessment:
-
Detail number of persons on site (including contractor details):
Management Controls – Project Management
-
Is the Safety Policy statement posted at the project?
-
Is the Contractor’s PSP current and in line with current work scope?
-
Response:
-
Is adequate site supervision on-site? (include figures in notes)
-
Response:
-
Have all the relevant safety inspections been carried out this month?
-
Response:
-
Have all incidents at the project been reported to SPEN Projects?
-
Response:
-
Has the Contractor attended this month’s Project Management Tour?
-
Response:
Management Controls – Contractor Management
-
Has each Contractor conducted Tool Box Talks this month?
-
Response:
-
List toolbox talks carried out this month including name and date: Photograph of list of completed TBT's is acceptable.
-
Has each Contractor maintained required training records / updates to training records this month?
-
Response:
-
Has each Contractor completed safety audits this month?
-
Response:
-
Have all actions identified on those safety audits been closed out satisfactorily?
-
Response:
-
Has each Contractor conducted PAT electrical inspections this quarter?
-
Response:
-
Has each Contractor maintained the plant and equipment register / inspections this month (weekly)?
-
Response:
-
Has each Contractor maintained the safety harness register / inspections this month (weekly)?
-
Response:
-
Has each Contractor maintained the lifting equipment test register / records this month?
-
Response:
-
Has each Contractor maintained the Hoist and MEWP inspection register / records this month (weekly)?
-
Response:
-
Has each Contractor maintained the Scaffold inspection register / records this month (weekly)?
-
Response:
-
Has each Contractor maintained the PASMA inspection register / records this month (weekly)?
-
Response:
-
Has each Contractor maintained the Ladder inspection register / records this month (weekly)?
-
Response:
-
Has each Contractor maintained the Excavation inspection register / records this month (daily)?
-
Response:
-
Has each Contractor maintained the COSHH Register / COSHH Assessments for all substances?
-
Has each Contractor maintained records to demonstrate that Client Authorisations are in place?
Management Controls – Site Management
-
Are induction records for the project being maintained (sample four operative / management names)?
-
Response:
-
Is the site sign-in sheet being maintained?
-
Response:
-
Are welfare arrangements sufficient for the work scope and detailed in the CPP / PSP?
-
Response:
-
General site observations
-
General site photographs