Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • DSS Reference

  • Claim Ref

  • Date

  • Update Report No

  • Policy Holder (s)

  • Policy Holder

  • Contractor

  • Risk Address

  • Risk Address

  • Health & Safety

SITE DOCUMENTATION

  • REQUIRED

  • ACTIONED

  • Construction Phase Plan

  • Risk Assessment

  • F10 Notification

  • Site Signage

  • Sign In Sheet

  • SITE SET UP

  • REQUIRED

  • ACTIONED

  • Access

  • Protections

  • Site Cleanliness

  • Lighting

  • Security (Fencing Etc)

  • WELFARE & HEALTH RISK

  • REQUIRED

  • ACTIONED

  • W/C, Hot & Cold Water

  • First Aid Kit

  • Fire Extinguisher

  • Electricity 110v Or 240v With Rcd

  • CONTRACTORS INSTRUCTIONS / VARIATIONS

Summary of Variations

  • Anticipated Costs

  • UPDATED CONTRACT COSTS REPORT:

  • PRESENT POSITION -

  • SUMMARY OF WORKS TO DATE

Project Duration:

  • Week:

PHOTOGRAPHS

  • Photograph 1

  • Photograph 2

  • Photograph 3

  • Photograph 4

  • Photograph 5

  • Photograph 6

  • Photograph 7

  • Photograph 8

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.