Conveyor Checklist
-
Job Number:
-
Motor Serial Number:
-
SFM Label:
PRE-COMMISSIONING CHECKS-LUBES
-
Grease lines installed and purged.
-
All fittings greased.
-
Zerust Spray G sprayed on all bare metal.EP2 GREASE
PRE-COMMISSIONING CHECKS-HWARE/TORQUES
-
Proper hardware used for application.
-
All hardware tensioned properly.
-
Loctite on all set screws.
-
Head and tail pulley bushings at proper torque.
-
Head and tail pulley centered with set-screws tightened
PRE-COMMISSIONING CHECKS-CONVEYOR BELT
-
Conveyor belt installed correct side up.
-
Belt routed correctly through the frame.
-
Cleated belt installed correct direction.
-
Vulcanized belt splice correct.
-
Proper clearance trough to belt (3∕16” Min.).
-
Belt tension correct. (Loose for Transport)
-
Take-ups even (1/8” allowable difference).
-
Sufficient take-up travel (belt adjustment).
PRE-COMMISSIONING CHECKS-SETTINGS
-
Correct motor installed per BOM. Motor PN:
-
Trough idlers slid towards tail pulley.
-
Return roller guards adjusted properly.
-
Flashing adjusted properly.
-
Hoses secured. (HYDRAULIC FASTENERS ON HOSE ENDS FOR MOTORS ARE HAND TIGHT ONLY READY FOR FITMENT TO MOTOR)
-
Astec Job # stamped ON LOCATION AS PER SN LOC Doc: 1
-
Verify all loose parts are located on belt along with associated Hware
PRE-COMMISSIONING CHECKS-PAINT / FINISH
-
ALL PAINTED SURFACES FREE FROM DIRT & GREASE
-
ALL PAINTED SURFACES FREE FROM RUST & CHIPS
-
Weld runs?