Title Page
-
Job Number
-
Module
-
Date
-
Conveyor Type
Documentation
-
Have you received a Kit List? If No, inform Supervisor or Team Leader
-
Have tails been fitted to the motors? If No, inform Supervisor to notify AW
-
Has the QC inspected the Drive Systems supplied is as per the Kit List?
-
Have you received SOP training for this task?
-
Have you read and understood the RAMS for this task?
-
Please sign
Before Belt is Fitted
-
Bolt Length Correct & Bolts Tight
-
Impact Section in correct position (See drawing) All bolts tight, and Spacing correct
-
Eye bolts fitted for emergency stop pull cords (Picking Station)
-
If a Magnet Section is applicable check all relative parts are Stainless Steel as per drawing
-
Drive drum bench checked by QC prior to installation
-
Drive drum set to correct level
-
Conveyor Belt and joint quality / Width is correct
-
Bearing grub screws torqued and marked (See table)
-
Insert photographs of Impact Sections and Belt Support Plates
-
Please sign
QC Check Before Belt is Fitted
-
Impact section
-
Magnet section
-
Drive drum bench and drum taper locks
-
Drums are level with impact bars or belt supports
-
Knee joint snub drum alignment with load roller correct
-
Bearing grub screws torqued and marked
-
Please sign
QC Belt Check
-
Conveyor Belt and joint quality / Width is correct
-
If chevron belt, are they going the correct way
-
Check belt direction- Inside joint line to drive drum first
-
Safety and ID Stickers positioned - photograph both sides
-
Please sign
After Belt is Fitted
-
Drive motor / gearbox on correct side of the conveyor
-
Gearbox retaining washer and safety bolt fitted and tightened
-
Gearbox fitted in the correct position for the conveyor angle
-
Check Belt tension / Enough adjustment
-
Return rollers fitted and locked
-
All skirting rubbers fitted as per measurement (90mm)
-
All bolts correct length and tight (See drawing)
-
Deflector kit fitted
-
Belt scraper fitted in correct position / Tensioned
-
Auto greasers fitted / Setting is zero at this time
-
Please Sign
Before Running Conveyor
-
All nip point guards are fitted
-
Please Sign
Conveyor Running inc. QC
-
Belt alignment correct on drive / tail drums and in middle of conveyor
-
There are no abnormal noises / vibrations whilst running
-
Motor temperature / movement is within acceptable limits
-
Skirting rubbers are not sticking to the belt / not too tight
-
Serial No. plate is fitted / Information correct / correct position
-
Insert Serial No.
-
Amps
-
Belt Speed
-
Please Sign
Feedboots and Chutes
-
Feedboots fitted
-
Chutes fitted
-
Please sign
QC Check Feedboots and Chute
-
Feedboots and Chutes fitted
-
Are all Decals positioned
-
Please Sign
Conveyor Complete
-
Is the conveyor complete?