Title Page
-
Select Part
- Front Fascia - NAFTA
- Front Fascia - BUX
- Front Fascia - Trail Hawk
- Rear Fascia - On Road Lower
- Rear Fascia - Trail Hawk Lower
- Rear Valance - SIngle Exh
- Rear Valance - Dual Exh No Hitch
- Rear Valance - Dual Exh With Hitch
- Rear Valance - Hidden Exh
- Liftgate Inner - Black
- Liftgate Inner - Frost
- Liftgate Inner - Ski Grey
-
Prepared by Team Leader
-
Prepared by Quality Tech
-
Conducted on
BELOW CHECKLIST IS COMPLETED BY TEAM LEAD
-
Is correct Material running?
-
Process Tech and Quality Tech have verified that MIC color match samples
-
Are all process settings within master?
-
Are Process Monitoring Points within specified limits?
-
Is the nozzle area clear from leaks?
-
Is the water flowing to the tool and press?
-
Is the correct robot program running?
-
Is automation working properly? (Flame, Gate cuts, Trimming?)
-
Are all Mold Heats in auto? (not saved or on %)
-
Are all tabs, holes, or slots clear of flash?
-
Is part free from tool marks, tool damage, or excessive flash?
-
Does the first off have an acceptable Quality Level?
-
Did you review part with operator for any quality issues?
-
Have you reviewed all Quality Alerts, Process Changes, Work Instructions?
-
Does the label match the part style?
-
Is the machine area cleaned to 5-S standard?
-
Are the knit lines in correct location according to knit line identification sheet?
-
Was the part checked for distortion to the grained area or discoloration?
-
Ensure there are no cracked, bent, or broken tabs.
-
Verify part does not have any visible glass pockets
-
Verify stands, tables, and/or rails are in acceptable conditions?
-
Master Cycle Time
-
Actual Cycle Time
Team Lead Verification
-
Team Lead Signature: Scan your badge
BELOW CHECKLIST IS COMPLETED BY TEAM LEAD
-
Conveyor settings are acceptable(no damage on parts)
-
Robot drop Point is acceptable (no damage parts, not too high/low)
-
Cell Layout is in order to provide a safe workplace (check rack position, bags, rails, and overall workspace)
-
Program WI's/JES are available and correct. Operators are aware and trained on all QA's and Process Changes
-
All racks, bags, packaging tools are correct and present per work instruction
-
All components, documents, and boundary samples from the previous run have been removed from the work cell
Team Lead Verification
-
Process Tech Signature: Scan your badge
BELOW CHECKLIST IS COMPLETED BY QUALITY TECH
-
Is correct Material running?
-
Process Tech and Quality Tech have verified that MIC color match samples
-
Are all process settings within master?
-
Are Process Monitoring Points within specified limits?
-
Is the nozzle area clear from leaks?
-
Is the water flowing to the tool and press?
-
Is the correct robot program running?
-
Is automation working properly? (Flame, Gate cuts, Trimming?)
-
Are all Mold Heats in auto? (not saved or on %)
-
Are all tabs, holes, or slots clear of flash?
-
Is part free from tool marks, tool damage, or excessive flash?
-
Does the first off have an acceptable Quality Level?
-
Did you review part with operator for any quality issues?
-
Have you reviewed all Quality Alerts, Process Changes, Work Instructions?
-
Does the label match the part style?
-
Is the machine area cleaned to 5-S standard?
-
Are the knit lines in correct location according to knit line identification sheet?
-
Was the part checked for distortion to the grained area or discoloration?
-
Ensure there are no cracked, bent, or broken tabs.
-
Verify part does not have any visible glass pockets
-
Verify stands, tables, and/or rails are in acceptable conditions?
-
Master Cycle Time
-
Actual Cycle Time
Quality Tech Verification
-
Quality Tech Signature: Scan your Badge
First Off Label
-
Take Photo of the Mold Label
-
Process Tech Signature: Scan your badge
-
Team Leader Signature: Scan your badge
-
Material Processor Signature: Scan your badge
-
Quality Tech Signature: Scan your Badge after verifying resin listed on schedule matches mold label