MEB Production LPA

  • Date:

  • Which Program are you auditing?

  • Select the KL FEM workstation or cell/area

  • Select the KL Front Fascia workstation or cell/area

  • Select the KL Rear Fascia workstation or cell/area

  • Select the KL Lift Gate workstation or cell/area

  • Select the KL Lift Gate workstation or cell/area

  • Which Shift (Crew) are you auditing?

  • Auditor 1

  • Auditor 2

  • Auditor 3

  • Operator

PRIDE Board

  • Item 1: Have the Safety, Quality, Timing, Cost, Morale metrics been updated within the past 24 hours?

  • Item 2: Are all posted documentation that track area progress/metrics in the area controlled or stated as "Reference Only"?

  • Item 3: Are all posted alerts (Process Change Notice, Quality Alerts, Safety Alerts, and Materials Alerts) unexpired?

  • Item 4: If any PCN's or Quality Alert's exists for this operation, verify that the operator is aware and is following the documented change.

Run Rabbit, First-off, and Equipment Start-Up Check Lists

  • Item 5: Verify the current day start-up controls for that product line were completed by start of shift or when first option part arrives (eg. Dazm)

  • Item 6: If a noted failure was found in start-up controls, verify that a reaction procedure followed.

Process Control

  • Item 7: Does the Team Member(s) know where the Standard Operation Sheet and Job Element Sheet are located?

  • Item 8: Is the Team Member aware of the part non-conforming process?

  • Item 9: If the JES calls out any key process symbols, verify that the operator understands the reasoning behind the denoted checks

  • Item 10: Verify appropriate PPE is called out on the SOS and is being worn. (safety glasses, belt covers, watch covers, aprons per plant specification).

  • Item 11: Verify the Team Member is following the MES.

  • Item 12: Observe and validate that the SOS/JES is being followed by each Team Member according to all chronological job elements (including any ergo or safety procedures/requirements).

  • Item 13: If there are any equipment, process torqueing or labeling in by-pass, verify there is a quality alert or bypass email stating the temporary process.

  • Item 14: Visit the designated non-conforming rack for the workstation or cell/area and verify the non-conforming process is being executed.

  • Item 15: Verify there is a documented CWI (Cleaning Work Instruction) and that the pucks are being followed according to the process.

  • Item 16: Review a minimum of 3 completed units from the process / station being audited and 3 customer ready finish good units.

OJT System

  • Item 17: If run rabbits are required for the work cell, verify that the operator who completed the rabbit is green in the OJT.

  • Item 18: Verify the Team Member in the work cell is green in the OJT system.

  • Item 19: Review OJT and ensure all present Team Members are signed off on all opened alerts.

Measuring Process

  • Item 20: Where applicable, verify that dimensional gauging (SPC) has been logged and completed as required.

  • Item 21: Where applicable, verify the calibration sticker on any measuring tool around the area (torque guns, gauge table, dial indicator) are present and not outdated.

Team Leader/ Production Manager Verification

  • Team Leader / Production Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.