Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
ALL checks are to be carried out in accordance with the following steps:
1. All emergency stop buttons checked and are in good condition with no visible damage to them.
What should happen if any damage present - Isolate Machinery and report immediately to Maintenance for repair,
2. Isolation switches in good working order.
What should happen : When isolation switch is in the off position check power is off by pressing start/restart button, machine should not start.
3. Fixed guards are in place, undamaged and access to moving parts is denied.
4. All interlock guards/light curtains checked and in good working order.
What should happen: when interlock opened machine should stop. Machine should not restart until start/restart button pressed.
Pre Start Up Checklist
-
Start up bread equipment from the console:
-
Oven Burners
-
Tin Conveyors
-
Discharge Conveyors
-
Depanner Vacuum
-
Prover Humidity
-
Prover Heat
-
Oven Steam
-
Ensure Scales are Level
Step 1
-
Check Mixer 3+4 interlocked grain hoist gates X 4
-
Check Mixer 3+4 interlocked dough skip gate
-
Check traversing hopper interlocked gate
-
Check interlocked gate access to platform area
Step 2
-
Check Intermediate Prover 3 +4 Light Curtain
-
Check Intermediate prover 3+4 Interlocked front panels X 2
-
Check Intermediate prover 3+4 Interlocked mesh panel X 1
-
Check Intermediate prover 3+4 Interlocked back panels X 2
Step 3
-
Check Moulder air hose
-
Check moulder 3+4 interlocked front perspex panel X 2
-
Check moulder 3+4 interlocked back panel X 2
-
Check moulder 3+4 dough depositing conveyor mesh guards X2
Step 4
-
Check square take overs interlocked doors X 5
Step 5
-
Check lidder interlocked doors X 4
Step 6
-
Check interlocked gate on lid storage area
Step 7
-
Check final prover castel keys X 2
Step 8
-
Check oven infeed and discharge light curtains
Step 9
-
Check delidder interlocked doors X 2
Step 10
-
Check depanner interlocked doors X 2
Step 11
-
Check pan stores interlocked gate
Workplace visible checks
-
Conveyors free from obstructions
-
floor dry and clean (free from spills, water and oil)
-
No wires dragging on the floor
-
No loose or damaged switches
-
No damage to control panels
-
No exposed or taped cables
-
Plugs and sockets intact
Depanner
-
Are all cups intact ?<br>If there are cups missing they need to be replaced before starting.
Manual Alarm Checks
-
Prover Infeed Alarm - loadbar
-
Double dough alarm
-
Prover outfeed alarm - unload bar
-
Oven infeed alarm load bar
-
Oven outfeed alarm Unload bar
-
Mixer drain is shut
-
All hoppers are zero
-
Mixer moves to half and full tilt and moving to correct side
-
The light curtains are to be checked at the beginning of both shifts and to be checked by both operators on shift
Oven Light Curtain
-
Is Light Curtain Operational ?<br>Does alarm sound when you break the beam ?<br>If no you must add a comment and contact Maintenance.
Checklist complete and ready to start.
-
Name and Signature of Supervisor
-
Date and Time
-
Name and Signature of Manager