Information
-
Inspection No.
-
Job Referance
-
Client / Site
-
Conducted on
-
Location
Site Induction
Construction phase plan & risk assessment
-
Toolbox Talk by Team Leader
- A Jones
- A R Nott
- S.Williams
- D Ardern
- T Heggs
- R.Petherick
- C.Fowler
- R.O'Conner
- C.Patterson
- Rob OC
- M.Davers
- S.Jones
- Cortney
- Alan W
- Other
-
Enter First and Last name
-
Click Names of those present.
- A Jones
- A R Nott
- S.Williams
- D Ardern
- T Heggs
- R.Petherick
- C.Fowler
- R.O'Conner
- C.Patterson
- Rob OC
- M.Davers
- S.Jones
- Cortney
- Alan W
- Other
Add other staff/persons present for the marquee build.
-
Name; First and last name
-
Add signature
Modifications to construction plan
-
Are there any modifications required to the Construction phase plan.
-
Detail the amendment required below and reassess the site
Over head hazards
-
Have over head clearance been met
- Grater than 6m
- Up to; 33 KV - 3.0m
- 66 KV - 3.2m
- 132 KV - 3.6m
- 275 KV - 4.6m
- 400 KV - 5.3m
-
Is the final structure at a safe distance from natural overhead hazards?<br>
Personnel Protective equipment
-
PPE being available and being worn?
- safety footwear
- Hard Hat
- high visibility vest / jacket
- Company Clothing
- Wet weather
- Sun Block
- Fall arrest equipment
Ground Inspection
-
Have underground services been checked
- Electricity
- Water
- Gas
- Not checked
-
Check ground conditions
- Soft
- Hard
- Too Hard
- Acceptable
Access Equipment
-
ladders, step ladders, hop ups being used.
- ID1
- ID2
- ID3
- ID4
- ID5
- ID6
- ID7
- ID8
- ID9
- ID10
- ID11
- ID12
-
Are they safe to use?
Identify defective equipment
-
Identify defective equipment
- ID1
- ID2
- ID3
- ID4
- ID5
- ID6
- ID7
- ID8
- ID9
- ID10
- ID11
- ID12
-
Defect
Site Set up
-
Perimeter sign marking been erected.<br>
-
Communication procedures for emergency's in place?
-
Record here emergency procedures.
Frame Marquee Inspection
-
Bracing wires/ beams on rof & Walls
-
There is no excessive weights suspended from the roof beams, ridges etc
-
Are all escape routes clear of obstructions and doors are operating correctly?<br>
-
Are all access and egress points where ropes and anchorages are located sufficiently highlighted?<br>
-
Are all fabrics free from un-repaired tears? if not provide photo evidence.
-
Ropes and wires sound
-
Is the flooring evenly laid with no tripping points?
-
Is the floor covering ie carpeting and other floor coverings securely fixed
-
Anchorages suitable and holding fast
-
Fabric is tensioned and not prone to ponding
-
Are roof linings at a sufficient height so as not to interfere with proceedings below.
-
Locking pins, bolts and R clips in place and secure
Site sundry instalations
-
Confirm all equipment installed to order form?
- Electrical appliances
- Heaters
- linings
- flooring and carpets
- Chairs
- Doors
- Tables
- Wood floor
- Clear panels
- Tent only supply
-
Have all subcontract materials been installed?
- Chairs
- Tables
- Screens
- Catering equipment
- Toliets
- Electrical appliances
- Incomplete
- Tent only supply
-
Other items supplied by subcontract company
-
All items correct? and qty correct?
-
Enter missing items
Sign off installation complete
-
Client has been informed of how to use ancillary equipment
- Yes
- No
- Not required
-
Site clean and tidy before handover
-
Marquee clean and tidy
-
Are all items as requested?
-
Marquee team leader sign off
-
Notes
-
Enter date and time
Customer sign off
-
Customer sign off
-
Notes