Title Page
-
Document No.
-
Audit Title
-
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
-
Add location
-
RMP document information up to date
-
Maps Updated and Coordinates Accurate
-
SDS' s Current
-
Inventory Updated and Accurate
-
Bulk tanks
-
Nurse tanks
-
Total Quantity
-
Bulk Plant data Documented & Current (Data plate, Pop-off, hydrostat info.)
-
Plant Equipment Current (Bulk head, Crash Protection, ESV, Breakaways, etc.)
-
Bulk head
-
Crash Protection
-
Saddles 1/3 Circumference of storage tanks
-
Emergency shut off (Liquid & Vapor)
-
Pull away protection on Load out
-
Pop off Valves Installed Correctly
-
Hydrostatic relief valves Installed Correctly
-
150 Gallon Water Tank or Larger
-
Leak Check (Every 5 Years)
-
911 Number and Physical Address Posted on Site
-
Proper Marking of Storage tanks
-
Proper Marking of Nurse tanks
-
Hazard Review Completed and Documented
-
Hazard Review Current (Every 5 years)
-
Operating Procedures Up to Date, Site specific, and include:
-
Initial Start Up
-
Normal Operations
-
Temporary Operations
-
Emergency Shut Down and Operation
-
Normal Shurdown
-
Startup following a shutdown or major change
-
Consequence of Deviation and steps to avoid deviation
-
Equipment Inspections Completed
-
ANSI Inspection Checklist Completed
-
Refresher Training (Every 3 years)
-
Hands on Training (site specific)
-
Maintenance Documented and Updated
-
Asmark Maintenance Manual Completed
-
Mainenance inspection Checklist Completed
-
Compliance Audit Completed
-
Compliance Audit Current (Every 3 Years)
-
Two most recent Compliance Audits Present
-
Compliance Audit deficiencies Completed within Alloted time
-
Emergency Actions have been Coordinated with Local Planning and Response Organizations
-
Adequate PPE and Respirators on site
-
Add signature