Title Page
-
Document No. 6
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Check the location from the pegs.
-
Check the number of piles.
-
Check the depth of the excavation.
-
Check the line of the piles - straight?
-
Check the spacing.
-
How are they going to prop the piles?
-
Are the piles set back as per the plan?<br><br>
-
Are the anchor piles all in?
-
Are the brace piles all in?
-
Are all of the braces in?
-
Are the bolts correct treatment - particularly the ones close to the ground?
-
Pouring the concrete - will trucks restrict access?
-
Have the neighbours on a ROW been informed?