Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Location
-
Personnel
Approvals and Documentation
Identification
-
Controlling Contractor:
-
Subcontractor:
-
Crane Contractor:
Approvals (Signature Required)
-
Date:
-
Site Superintendent:
-
Contractor Lift Supervisor: ( This individual must be present during the lift)
-
Operator:
Attachments (Add photos)
-
Operator Certifications:
-
Add media
-
Signal Person Certifications:
-
Add media
-
Qualified Rigger Training Documentation:
-
Add media
Pre-Lift Checklist
-
Hand Signal charts are on site?
-
Have weather conditions been considered?
-
Has the stability of the ground been assured?
-
Have the general safety precautions been reviewed?
-
Has a Pre-lift meeting taken place?
-
Has all rigging equipment been inspected?
-
Is swing rotation open and barricaded?
-
Are crane inspection records up to date?
-
Are outriggers fully extended?
-
Is a tag-line going to be used?
-
Reason for no tag line?
-
Will any section of the crane operation or lift structure be within 20 feet of a power line?
-
Stop lifting operation and contact controlling contractor safety representative.