Title Page
-
Conducted on
-
Prepared by
-
Location
Safety
-
The area is safe and free from hazards
-
Electric pallet truck scaff tag signed by operator
-
Employees within the area understand and demonstrate the key safe behaviours
-
X-ray curtains all present and in correct position
CCP
-
Warm fill sheets are at line when / where required and completed in accordance with CFILL.30
-
All X-ray's machines are functioning correctly and checks complete in accordance with CFILL.31 have been observed , reject line doors are kept locked.
-
Filler 1 & 2 & 9: Is the NEXT Calibration on the X-Ray due within 1 month? (Check Calibration Sticker)<br>If "YES" insert date due or take photo of the sticker.<br>
-
Filler 3 & 4: Is the NEXT Calibration on the X-Ray due within 1 month? (Check Calibration Sticker)<br>If "YES" insert date due or take photo of the sticker.
-
Filler 5 & 6: Is the NEXT Calibration on the X-Ray due within 1 month? (Check Calibration Sticker)<br>If "YES" insert date due or take photo of the sticker.
-
Is the NEXT Calibration on the ATP Swab Machine due within 1 month? (Check Calibration Sticker)<br>If "YES" insert date or take photo<br>
-
If the answer to ANY of the previous question relating to CALIBRATION is "YES", then this must be escalated to TECHNICAL and your TEAM LEADER immediately.
Chemical Control
-
All chemicals stored in locked COSHH cabinets when not in use including ink and additive and chain oil . CGEN.04
Paperwork & Documentation
-
All paperwork is on the correct Centuri document number
-
All paperwork is correctly completed and any corrections have been made in accordance with the Paperwork - Record Completion & Maintainance procedure
-
Weight checks complete in accordance with CFILL.05.
-
Each order has been correctly documented, foil tray labels checks have been completed in accordance with CFILL.50
-
Daily and monthly glass registers are up to date
Hygiene & Fabrication
-
All fillers are clean , free from foreign bodies , debris and excess grease internally , externally and underneath.
-
End of line equipment including conveyors and X-rays are clean and free from debris internally and externally
-
Absence of selotape engineering
-
All floors and drains are clean and free from debris.
-
Cleaning equipment such as brushes are clean and stored on the correct shadow boards. CGEN 03.
-
Cleaning schedules are complete and up to date for daily, weekly and monthly tasks
-
Internal building fabrication such as walls and floors are in a good state of repair
Operator Asset Care
-
The Inkjet OAC schedule is up to date for daily, weekly and monthly tasks
-
Spare inkjet coders are running on all fillers.
-
The Logopak OAC schedule is up to date for daily, weekly and monthly tasks, label stocks have been replenished
5s
-
Area audits complete to schedule and evidently compliant with visual standards. Logopak cabinets have been replenished
-
Foil cabinet audits are complete
-
All SIC boards are up to date with actions when hourly targets have not been met
-
Ink and additive stock are above minimum level ( Ink 50 bottles / Additive 100 bottles ). Team leader informed if minimum stock level not met and stock ordered.
-
Radios x 3 working & in good condition.
Other Comments
-
CONFIRMATION:
I can confirm that all responses are accurate and the information contained within this audit were checked at the time of the audit by myself. -
Verified by:
-
Add media