25 VMR AND COIL CLEANING

25 VMR PILGER AND COIL CLEANING

  • Operator

  • Work Order

  • Incoming Hollow Inspect <br><br>

  • Are mandrel & die series numbers identified on Control Chart

  • OD Size <br>Verify samples within spec

  • Wall Size<br>Verify within spec

  • ID Condition <br>Are samples being split for inspection of defects ?

  • Log Book Used ?

  • Standard Feed Rate<br>Is mill running at feed rate indicated on tooling sheet

  • Ridges

  • Oil Temperature Must not exceed 40C

  • Eccentricity<br>Are min wall readings above min spec ?

  • Cut Length<br>Verify Correct cut length

  • OD Cleanliness

  • OD Surface Condition<br>Does pick up buff out with scotchbrite

  • Chemical Dispensing Station Verify the PH of solutions using test strips

  • OD Wash Box Verify Wash box is being heated

  • Coilers OD Cleanliness and Surface Condition<br>Are coils clean ?

  • Cleaning Cycle Verification<br>Is correct cleaning recipe being used based on length ?<br>

  • Coiler Checklist <br>Is it being filled out ?

  • ID Cleanliness/Plug Size<br>Correct plug being used

  • ID Cleanliness/Check Plug<br>Are check plugs white

TWIN MILL AND COIL COIL CLEANING

  • Operator

  • Work Order

  • Incoming Hollow Inspect <br><br>

  • Are mandrel & die series numbers identified on Control Chart

  • OD Size <br>Verify samples within spec

  • Wall Size<br>Verify within spec

  • ID Condition <br>Are samples being split for inspection of defects ?

  • Log Book Used ?

  • Standard Feed Rate<br>Is mill running at feed rate indicated on tooling sheet

  • Ridges

  • Oil Temperature Must not exceed 40C

  • Eccentricity<br>Are min wall readings above min spec ?

  • Cut Length<br>Verify Correct cut length

  • OD Cleanliness

  • OD Surface Condition<br>Does pick up buff out with scotchbrite

  • Chemical Dispensing Station Verify the PH of solutions using test strips

  • Cleaning Cycle Verification<br>Is correct cleaning recipe being used based on length ?<br>

  • OD Wash Box Verify Wash box is being heated

  • Coilers OD Cleanliness and Surface Condition<br>Are coils clean ?

  • Coiler Checklist <br>Is it being filled out ?

  • ID Cleanliness/Plug Size<br>Correct plug being used

  • ID Cleanliness/Check Plug<br>Are check plugs white

  • ID Cleanliness/Feedrate<br>Can operators follow proper cleaning procedure at standard feedrate

  • Coiler Log Book<br>Any Issues

40 SSM AND COIL CLEANING

  • Operator

  • Work Order

  • Incoming Hollow Inspect <br><br>

  • Are mandrel & die series numbers identified on Control Chart

  • OD Size <br>Verify samples within spec

  • Wall Size<br>Verify within spec

  • ID Condition <br>Are samples being split for inspection of defects ?

  • Log Book Used ?

  • Standard Feed Rate<br>Is mill running at feed rate indicated on tooling sheet

  • Ridges

  • Oil Temperature Must not exceed 40C

  • Eccentricity<br>Are min wall readings above min spec ?

  • Cut Length<br>Verify Correct cut length

  • OD Cleanliness

  • OD Surface Condition<br>Does pick up buff out with scotchbrite

  • Chemical Dispensing Station Verify the PH of solutions using test strips

  • Cleaning Cycle Verification<br>Is correct cleaning recipe being used based on length ?<br>

  • OD Wash Box Verify Wash box is being heated

  • Coilers OD Cleanliness and Surface Condition<br>Are coils clean ?

  • Coiler Checklist <br>Is it being filled out ?

  • ID Cleanliness/Plug Size<br>Correct plug being used

  • ID Cleanliness/Feedrate<br>Can operators follow proper cleaning procedure at standard feedrate

  • ID Cleanliness/Check Plug<br>Are check plugs white

50 VMR #2

  • Operator

  • Work Order

  • Incoming Hollow Inspect <br><br>

  • Are mandrel & die series numbers identified on Control Chart

  • OD Size <br>Verify samples within spec

  • Wall Size<br>Verify within spec

  • ID Condition <br>Are samples being split for inspection of defects ?

  • Log Book Used ?

  • Standard Feed Rate<br>Is mill running at feed rate indicated on tooling sheet

  • Ridges

  • Oil Temperature Must not exceed 40C

  • Eccentricity<br>Are min wall reading above min spec

  • Cut Length<br>Verify Correct cut length

  • OD Cleanliness

  • OD Surface Condition<br>Does pick up buff out with scotchbrite

  • Chemical Dispensing Station Verify the PH of solutions using test strips

  • OD Wash Box Verify Wash box is being heated

  • ID Cleanliness/Plug Size<br>Correct plug being used

  • ID Cleanliness/Feedrate<br>Can operators follow proper cleaning procedure at standard feedrate

  • ID Cleanliness/Check Plug<br>Are check plugs white

50 VMR #1

  • Operator

  • Work Order

  • Incoming Hollow Inspect <br><br>

  • Are mandrel & die series numbers identified on Control Chart

  • OD Size <br>Verify samples within spec

  • Wall Size<br>Verify within spec

  • ID Condition <br>Are samples being split for inspection of defects ?

  • Log Book Used ?

  • Standard Feed Rate<br>Is mill running at feed rate indicated on tooling sheet

  • Ridges

  • Oil Temperature Must not exceed 40C

  • Eccentricity<br>Are min wall reading above min spec

  • Cut Length<br>Verify Correct cut length

  • OD Cleanliness

  • OD Surface Condition<br>Does pick up buff out with scotchbrite

  • OD Wash Box Verify Wash box is being heated

  • Chemical Dispensing Station Verify the PH of solutions using test strips

  • ID Cleanliness/Plug Size<br>Correct plug being used

  • ID Cleanliness/Feedrate<br>Can operators follow proper cleaning procedure at standard feedrate

  • ID Cleanliness/Check Plug<br>Are check plugs white

H2 FURNACE

  • Operator

  • Work Order

  • OD Cleanliness Check

  • ID Cleanliness Check

  • Correct Speed And Temperature

  • Correct Gas Setting

  • OD Surface Condition After Anneal

UNCOILER

  • Operator

  • Work Order

  • Incoming Surface and Size Check

  • Outgoing Surface and Size Check

  • Straightness and Deburr

PBS SAW

  • Operator

  • Work Order

  • OD Surface Condition<br>

  • Jaw Cleanliness <br>Is Jaw Area Being Kept Clean

  • Correct Cut Length<br>Is length correct according to E-Travel

  • End Condition<br>Check each end of tubes is deburr acceptable

  • OD Buff<br>Is OD buff acceptable

PBS E/C INSPECTION

  • Operator

  • Check and verify that linemarking has been<br>stamped off by a qualified operator

STRAIGHTENER

  • Operator

  • Work Order

  • OD Size <br>Verify specs in E-Travel<br>

  • Hardness and Straightness<br>Are both acceptable ?<br>

  • OD Surface

  • Control Charts <br>Are they being filled out ?

12 HEAD POLISHER

  • Operator

  • Work Order

  • Are tubes plugged before polish ?

  • OD Size Incoming

  • OD Size After Polish <br>Is the correct amount being removed ?

  • OD Finish

WESTWAY FINISH CUT

  • Operator

  • Work Order

  • End Condition <br>Check for jaw marks and check deburr

  • Cut Length<br>Is it acceptable ?

LEVEL WIND

  • Operator

  • Work Order

  • OD Surface <br>Is OD finish acceptable

  • Check Linemarking <br>Is it stamped off by a qualified operator

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.