Title Page
-
Document No.
-
Critical Points Audit South Bay
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
A and B Line
A-B Line
-
Incoming OD Surface
-
Incoming size
-
Outgoing OD Surface
-
Outgoing OD Size
-
Cut Length
-
Control Charts Completed
-
Saw Jaws Clean
-
Buff and Deburr
-
ID Tags on Material
Induction Anneal
Induction Anneal
Inductions 3 and 4
-
Clean out schedule completed
-
Incoming Surface Condition
-
Incoming Size Ok
-
Outgoing Surface Condition
-
Outgoing Size Ok
-
Control Charts Complete ?
-
Anneal Temperature Ok ?
-
Correct Purge Gas ?
-
Set Point Temperature Correct ?
-
Continuous ID Purge Running ?
-
Straightener Rolls Clean ?
-
Correct Gas Flow & PSI
-
Welds Look Ok ?
-
Tube Ends Capped ?
-
Line Speed Correct ?
-
ID Tags on Material ?
Induction #1
-
Clean out schedule completed
-
Incoming Surface Condition
-
Incoming Size Ok
-
Outgoing Surface Condition
-
Outgoing Size Ok
-
Control Charts Complete ?
-
Anneal Temperature Ok ?
-
Correct Purge Gas ?
-
Set Point Temperature Correct ?
-
Continuous ID Purge Running ?
-
Straightener Rolls Clean ?
-
Control Charts Completed ?
-
Correct Gas Flow & PSI
-
Welds Look Ok ?
-
Tube Ends Capped ?
-
Line Speed Correct ?
-
ID Tags on Material ?
Induction #2
-
Clean out schedule completed
-
Incoming Surface Condition
-
Incoming Size Ok
-
Outgoing Surface Condition
-
Outgoing Size Ok
-
Anneal Temperature Ok ?
-
Control Charts Complete ?
-
Correct Purge Gas ?
-
Set Point Temperature Correct ?
-
Continuous ID Purge Running ?
-
Straightener Rolls Clean ?
-
Correct Gas Flow & PSI
-
Welds Look Ok ?
-
Tube Ends Capped ?
-
Line Speed Correct ?
-
ID Tags on Material ?
Induction #5
-
Clean out schedule completed
-
Incoming Surface Condition
-
Incoming Size Ok
-
Outgoing Surface Condition
-
Outgoing Size Ok
-
Anneal Temperature Ok ?
-
Control Charts Complete ?
-
Correct Purge Gas ?
-
Set Point Temperature Correct ?
-
Continuous ID Purge Running ?
-
Straightener Rolls Clean ?
-
Correct Gas Flow & PSI
-
Welds Look Ok ?
-
Tube Ends Capped ?
-
Line Speed Correct ?
-
ID Tags on Material ?
Induction #6
-
Clean out schedule completed
-
Incoming Surface Condition
-
Incoming Size Ok
-
Outgoing Surface Condition
-
Outgoing Size Ok
-
Anneal Temperature Ok ?
-
Control Charts Complete ?
-
Correct Purge Gas ?
-
Set Point Temperature Correct ?
-
Continuous ID Purge Running ?
-
Straightener Rolls Clean ?
-
Correct Gas Flow & PSI
-
Welds Look Ok ?
-
Tube Ends Capped ?
-
Line Speed Correct ?
-
ID Tags on Material ?
Bullblock
Bullblock
-
Incoming Surface
-
Outgoing Surface
OD Size
-
Ingoing Size
-
Outgoing Size
Bullblock Cleaning
-
Stripping Rubbers Ok
-
Cleaning Fluids Ok
-
Ultrasonics Ok
-
Fluid Change Schedule Followed
-
Tooling and Die Cards Filled Out
Butt Weld 1 & 2
-
Incoming Surface Clean ?
-
Incoming Surface Condition ?
-
Weld Look Good ?
-
ID Clean/Check Plugs Saved ?
-
Continuous ID Purge Running ?
Air Underwater/Level Wind
Air Underwater
-
Pump Running? Light should be green
Level Wind South South Bay
-
Incoming Surface Condition
-
Outgoing Surface Condition
-
Incoming Coils/Welds
-
Ingoing Size Ok ?
-
Outgoing Size Ok ?
-
Control Charts Completed ?
-
OD Buff Acceptable ?