Title Page

  • Document No.

  • Critical Points Audit South Bay

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

A and B Line

A-B Line

  • Incoming OD Surface

  • Incoming size

  • Outgoing OD Surface

  • Outgoing OD Size

  • Cut Length

  • Control Charts Completed

  • Saw Jaws Clean

  • Buff and Deburr

  • ID Tags on Material

Induction Anneal

Induction Anneal

Inductions 3 and 4

  • Clean out schedule completed

  • Incoming Surface Condition

  • Incoming Size Ok

  • Outgoing Surface Condition

  • Outgoing Size Ok

  • Control Charts Complete ?

  • Anneal Temperature Ok ?

  • Correct Purge Gas ?

  • Set Point Temperature Correct ?

  • Continuous ID Purge Running ?

  • Straightener Rolls Clean ?

  • Correct Gas Flow & PSI

  • Welds Look Ok ?

  • Tube Ends Capped ?

  • Line Speed Correct ?

  • ID Tags on Material ?

Induction #1

  • Clean out schedule completed

  • Incoming Surface Condition

  • Incoming Size Ok

  • Outgoing Surface Condition

  • Outgoing Size Ok

  • Control Charts Complete ?

  • Anneal Temperature Ok ?

  • Correct Purge Gas ?

  • Set Point Temperature Correct ?

  • Continuous ID Purge Running ?

  • Straightener Rolls Clean ?

  • Control Charts Completed ?

  • Correct Gas Flow & PSI

  • Welds Look Ok ?

  • Tube Ends Capped ?

  • Line Speed Correct ?

  • ID Tags on Material ?

Induction #2

  • Clean out schedule completed

  • Incoming Surface Condition

  • Incoming Size Ok

  • Outgoing Surface Condition

  • Outgoing Size Ok

  • Anneal Temperature Ok ?

  • Control Charts Complete ?

  • Correct Purge Gas ?

  • Set Point Temperature Correct ?

  • Continuous ID Purge Running ?

  • Straightener Rolls Clean ?

  • Correct Gas Flow & PSI

  • Welds Look Ok ?

  • Tube Ends Capped ?

  • Line Speed Correct ?

  • ID Tags on Material ?

Induction #5

  • Clean out schedule completed

  • Incoming Surface Condition

  • Incoming Size Ok

  • Outgoing Surface Condition

  • Outgoing Size Ok

  • Anneal Temperature Ok ?

  • Control Charts Complete ?

  • Correct Purge Gas ?

  • Set Point Temperature Correct ?

  • Continuous ID Purge Running ?

  • Straightener Rolls Clean ?

  • Correct Gas Flow & PSI

  • Welds Look Ok ?

  • Tube Ends Capped ?

  • Line Speed Correct ?

  • ID Tags on Material ?

Induction #6

  • Clean out schedule completed

  • Incoming Surface Condition

  • Incoming Size Ok

  • Outgoing Surface Condition

  • Outgoing Size Ok

  • Anneal Temperature Ok ?

  • Control Charts Complete ?

  • Correct Purge Gas ?

  • Set Point Temperature Correct ?

  • Continuous ID Purge Running ?

  • Straightener Rolls Clean ?

  • Correct Gas Flow & PSI

  • Welds Look Ok ?

  • Tube Ends Capped ?

  • Line Speed Correct ?

  • ID Tags on Material ?

Bullblock

Bullblock

  • Incoming Surface

  • Outgoing Surface

OD Size

  • Ingoing Size

  • Outgoing Size

Bullblock Cleaning

  • Stripping Rubbers Ok

  • Cleaning Fluids Ok

  • Ultrasonics Ok

  • Fluid Change Schedule Followed

  • Tooling and Die Cards Filled Out

Butt Weld 1 & 2

  • Incoming Surface Clean ?

  • Incoming Surface Condition ?

  • Weld Look Good ?

  • ID Clean/Check Plugs Saved ?

  • Continuous ID Purge Running ?

Air Underwater/Level Wind

Air Underwater

  • Pump Running? Light should be green

Level Wind South South Bay

  • Incoming Surface Condition

  • Outgoing Surface Condition

  • Incoming Coils/Welds

  • Ingoing Size Ok ?

  • Outgoing Size Ok ?

  • Control Charts Completed ?

  • OD Buff Acceptable ?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.