Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Prepared by
-
Location
-
Personnel
Coils In
Coils in
-
Incoming surface clean/dry/oxidized ?
-
Incoming surface condition ?
-
I'd tags on material ?
-
Incoming surface condition
Butt weld 1
-
Operator name:
-
Material:
-
Incoming surface clean/dry/oxidized ?
-
Welds look good ?
-
I.d. Clean/check plugs saved ?
-
End facer equipment ok ?
-
Weld heads ok ?
-
Correct atmosphere gas ?
-
Correct purge gas ?
-
Control charts completed ?
-
I.d. Tags on material ?
Butt weld 2
-
Operator name:
-
Material:
-
Incoming surface clean / dry ?
-
Incoming surface condition
-
Welds look good ?
-
I.d. Clean/check plugs saved ?
-
End facer equipment ok ?
-
Weld heads ok ?
-
Correct atmosphere gas ?
-
Correct purge gas ?
-
Control charts completed ?
-
I.d. Tags on material ?
Induction 3
-
Operator name:
-
Material:
-
Incoming surface clean/dry/oxidized ?
-
Outgoing surface condition
-
Incoming surface condition
-
Welds breaking ?
-
Welds look good ?
-
Rolls clean ?
-
Correct roll size installed ?
-
Stripping rubbers ok ?
-
Tube ends capped ?
-
Coils properly formed ? / tangled ?
-
Line speed correct ?
-
Set point temperature correct ?
-
Recording systems functioning ?
-
Anneal temperature ok ?
-
Correct atmosphere gas ?
-
Correct purge gas ?
-
Ingoing o.d. Size ok ?
-
Outgoing o.d size ok ?
-
Control charts completed ?
-
Correct gas flow and pressure ?
-
Continuous I.d. Purge running ?
-
I.d. Tags on material ?
-
Quench flow good ?
-
Ircon alignment ok ?
-
Wipe condition ?
-
Sight port glass appears clean ?
Induction 4
-
Operator name:
-
Material:
-
Incoming surface clean/dry/oxidized ?
-
Outgoing surface condition ?
-
Incoming surface condition
-
Welds breaking ?
-
Welds look good ?
-
Rolls clean ?
-
Correct roll size installed ?
-
Tube ends capped ?
-
Coils properly formed ?
-
Stripping rubbers ok ?
-
Line speed correct ?
-
Set point temperature correct ?
-
Recording systems functioning ?
-
Anneal temperature ok ?
-
Correct atmosphere gas ?
-
Correct purge gas ?
-
Ongoing o.d. Size ok ?
-
Outgoing o.d. Size ok ?
-
Control charts completed ?
-
Correct gas flow and pressure ?
-
Continuous I.d. Purge running ?
-
I.d. Tags on material ?
-
Quench flow good ?
-
Ircon alignment ok ?
-
Wipe condition ?
-
Sight port glass appears clean ?
Blockdraw
-
Operator name:
-
Incoming surface clean/dry/oxidized ?
-
Material
-
Outgoing surface condition
-
Incoming surface condition
-
Run speed
-
Welds breaking ?
-
Coils properly formed ?
-
Stripping rubbers ok ?
-
Cleaning fluids ok ?
-
Ultrasonics ok ?
-
Lube tank full/clean ?
-
Fluid change schedule followed ?
-
Set point temperature correct ?
-
Outgoing o.d. Size ok ?
-
Outgoing wall thickness ok ?
-
Control charts completed ?
-
Die series identified on control chart ?
-
Is solvent wash box clean inside ?
-
Correct size die installed ?
-
I.d. Tags on material ?
Induction 1
-
Operator name:
-
Material:
-
Incoming surface clean/dry/oxidized ?
-
Outgoing surface condition
-
Incoming surface condition ?
-
Incoming welds broken ?
-
Rolls clean ?
-
Correct size rolls installed ?
-
Tube ends capped ?
-
Coils properly formed ?
-
Stripping rubbers ok ?
-
Line speed correct ?
-
Set point temperature correct ?
-
Correct purge gas ?
-
Recording systems functioning ?
-
Anneal temperature ok ?
-
Correct atmosphere gas ?
-
Ingoing O.D. Size O.K. ?
-
Outgoing o.d. Size ok ?
-
Control charts completed ?
-
Correct gas flow and psi ?
-
Continuous I.d. Purge running/connected ?
-
I.d. Tags on material ?
-
Quench flow good ?
-
Ircon alignment looks ok ?
-
Wipe condition ?
-
Sight port glass looks clean ?
Induction 2
-
Operator name:
-
Material:
-
Incoming surface clean/dry/oxidized ?
-
Outgoing surface condition
-
Incoming surface condition
-
Incoming welds broken ?
-
Rolls clean ?
-
Correct size rolls installed ?
-
Tube ends capped ?
-
Coils properly formed ?
-
Stripping rubbers ok ?
-
Line speed correct ?
-
Set point temperature correct ?
-
Recording systems functioning ?
-
Anneal temperature ok ?
-
Correct atmosphere gas ?
-
Correct purge gas ?
-
Ingoing o.d. Size ok ?
-
Outgoing o.d. Size ok ?
-
Control charts completed ?
-
Correct gas flow and pressure ?
-
Continuous I.d. Page connected/running ?
-
I.d. Tags on material ?
-
Quench flow good ?
-
Ircon alignment looks ok ?
-
Wipe condition ?
-
Sight port glass appears clean ?
Induction 5
-
Operator name:
-
Material:
-
Incoming surface clean/dry/oxidized ?
-
Outgoing surface condition
-
Incoming surface condition
-
Incoming welds broken ?
-
Rolls clean ?
-
Correct roll size installed ?
-
Tube ends capped ?
-
Coils properly formed ?
-
Stripping rubbers ok ?
-
Line speed correct ?
-
Set point temperature correct ?
-
Recording systems functioning ?
-
Anneal temperature ok ?
-
Correct atmosphere gas ?
-
Correct purge gas ?
-
Ingoing o.d. Size ok ?
-
Outgoing o.d. Size ok ?
-
Control charts completed ?
-
Correct gas flow and pressure ?
-
Continuous I.d purge running/connected ?
-
I.d. Tags on material ?
-
Quench flow good ?
-
Ircon alignment looks ok ?
-
Wipe condition ?
-
Sight port glass appears clean ?
Induction 6
-
Incoming surface clean/dry/oxidized ?
-
Outgoing surface condition
-
Incoming surface condition
-
Incoming welds broken ?
-
Rolls clean ?
-
Correct roll size installed ?
-
Tube ends capped ?
-
Coils properly formed ?
-
Stripping rubbers ok ?
-
Line speed correct ?
-
Set point temperature correct ?
-
Recording systems functioning ?
-
Anneal temperature ok ?
-
Correct atmosphere gas ?
-
Correct purge gas ?
-
Ongoing o.d. Size ok ?
-
Outgoing o.d. Size ok ?
-
Control charts completed .
-
Correct gas flow and pressure ?
-
Continuous I.d. Purge running/connected ?
-
I.d. Tags on material ?
-
Quench flow good ?
-
Ircon alignment looks ok ?
-
Wipe condition ?
-
Sight port glass appears clean ?
A&B line
-
Operator name:
-
Material:
-
Incoming surface clean/dry/oxidized ?
-
Outgoing surface condition ?
-
Incoming surface condition ?
-
Cut length ok ?
-
Incoming coils broken ?
-
Rolls clean ?
-
Correct roll size installed ?
-
Roll wipes in use and clean ?
-
Incoming coils properly formed/tangled ?
-
Recording systems functioning ?
-
Ingoing O.D. Size O.K. ?
-
Outgoing o.d. Size ok ?
-
Control charts completed ?
-
Saw lubricant working ?
-
Trough surfaces clean ?
-
Saw jaws clean ?
-
Tubes straight / ripple acceptable ?
-
Tube ends properly deburred ?
-
Good o.d. Buff / grind quality ?
-
I.d. Tags on material ?
Air under water
-
Recirc pump ON ?
-
Flow good ?
Butt weld 1 and 2
Untitled page