Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Van Runner-
-
Cut out checklist complete
-
All lights cut out and located as per plan
-
Lights and fans free from/cut through metal plaster battens
-
Exhaust fans cut out, ducts and plug base within reach
-
All switches and GPOs cut out
-
Cables for Switches and GPOs pulled to cut out and left in wall
-
Batten Holder cable pulled to cut out
-
Island bench lights cut out and spaced evenly/centred
-
Kitchen cut out
-
Cabinetry cut out correctly using correct size hole saw
-
Cables bought through for under cupboard/strip lights
-
Smoke Detectors cut out
-
Stair Lights cut out
-
Outside GPOs/lights pulled through bricks/hebel and in correct location for services
-
Ducts brought through bricks/hebel and vents f/o
-
Damage job report completed, with all items listed
-
Job Swept out/rubbish in bin
-
Any other issues