Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
General Inspection Rules:
1.) All PFAS will be inspected by the user BEFORE EACH USE
2.) The Competent person will inspect PFAS semi-annually (2 times a year) using this form
3.) When an inspection reveals defects or damage, the equipment shall be removed from service immediately and tagged "Out of Service".
Inspection Checklist Log
-
Harness Model:
-
Manufacture Date:
-
In Service Date:
-
Purchase Date:
-
Serial Number:
-
Issued To:
General Inspection Factors
-
Hardware: (Includes D-rings, buckles, keepers, and back pads) Inspect for bending, distortion, sharp edges, burrs, cracks and corrosion.
-
Supporting Details:
-
Take photo of damage
-
Webbing: Inspect for cuts, frayed edges, burns, chemical deterioration, holes or tears, excessive soiling, and discoloration.
-
Supporting Details:
-
Take photo of damage
-
Stitching: Inspect for pulled or cut stitches.
-
Supporting Details:
-
Take photo of damage
-
Labels: Inspect, make certain all labels are securely held in place and legible
-
Supporting Details:
-
Take photo of illegible tags or labels
-
Overall Disposition:
-
Inspected By: