Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Documentation
-
General comments:
-
State and Federal Listing posted at the site<br>
-
Daily Job Safety Analysis reviewed, updated and signed
-
Emergency contact list posted
-
Documentation of corrective actions taken since last audit?
-
Weekly safety meetings being completed
-
Weekly equipment checklist completed
-
Copy of safety manual, MSDS, tabulated data
Subcontractor Compliance
-
General comments:
-
Subcontractor per-construction meeting completed and documented.
-
Drug testing information collected.
-
Subcontractors have submitted training documentation for he task that will perform.
-
Subcontractors have completed a JSA for the task that they will complete. <br><br><br><br>
-
Subcontractors have completed and submitted weekly safety meetings.
-
Subcontractors are complying with PPE requirements.
Personal Protective Equipment (PPE)
-
General comments:
-
Eye protection including side shields (100%)
-
Head protection (100%)<br>
-
Hearing protection required and worn
-
High visibility clothing / vests worn by none burning or climbing employees.(100%)
-
Respiratory protection equipment worn and stored properly where required.
-
Speciality PPE (face shields, FR clothing)
Fall Protection
-
General comments:
-
Fall protection required (All work over 6' requires fall protection)
-
Have all employees who are working at height (6' or greater) trained in fall protection.
-
Have the fall hazards been addressed in a JSA
-
Harnesses, SRL's, and fall protection equipment has been inspected before use and in good condition
-
What form of rescue will be used in the event a fall takes place.
Holes
-
General comments:<br>
-
Have all holes been properly protected. (2" or greater)
-
Have all hole covers been properly secured, and markerd with the words" HOLE".
Guardrails
-
General comments:
-
Toprail 42+/- 3", Midrail 21+/3", Toe board.
-
Cable Guardrail: Top rail 42" +/- 3", do not deflect below 39". <br>
-
Stanstions on 8' centers. <br>
-
Flagging placed every 6'.
-
Free from laceration hazards.
-
Completely protects against the hazard.
Ladders & Barricades
-
General comments.
-
Have all ladders been inspected before use.
-
Do ladders have proper footing.
-
Are ladders used in a dully opened position.
-
Is the ladder positioned so the base of the ladder is one foot away for every four feet of height. (4:1 ratio)
-
Do side rails extend 36" above the landing area.
-
Have ladders been properly secured.
-
Employees maintaining 3 points of contact when using the ladder.
-
Can work be performed within the confines of the side rails.
Excavation Safety
-
General comments:
-
Has a Competent person been assigned to the task
-
Has the Utility One Call been made. Are marking updates being made, and information being received.
-
Have underground utilities been identified / located and marked
-
Have adjacent structures / utilities been properly protected or supported. <br>
-
Has the trench / excavation been inspected before entry's
-
Is a ladder or acceptable means of egress provided in all trenches / excavations 4' or deeper
-
Are excavations 5' deep or deeper properly protected. (Sloped, bench, shielded, or shored)
-
Are trench boxes in good condition, spreaders properly installed, stacking pins in place. <br><br>List Box numbers:<br><br><br>
Vehicles & Equipment
-
General comments:
-
Is all equipment equipped with a fire extinguisher (Extinguishers inspected and up-dated)<br><br><br>
-
Are all safety devices in place and working (Back-up alarms, etc..)<br>
-
Power lines de-energized and/or safe distance from equipment (10 feet)
-
Is demolition equipment equipped with safety cages (Including hammering operation)
-
Aerial lifts inspected and used properly (Controls inspected and tested daily)
-
Crane operators NCCO License current and on file.
-
Daily crane inspection completed
-
Swing radius protected
-
Prelift form completed before all lifts.
-
Rigging inspected before all lifts.
-
All chains / nylon / wire rope slings labeled.
-
Shackles and hooks inspected for deformation, keepers present.
-
Loads rigged by a qualified rigger.
-
Crane maintaining 20' from overhead powerlines, or if voltage is known, following Table A.
Material Handleing and Concrete Construction
-
General comments:<br>
-
Men lifting correctly.
-
Are form brackets inspected.
-
Walkways over rebar mats.
-
Has all reinforcement bar that presents an impalment, or cut hazard been protected
-
Materials properly stored, labeled and stacked.
Housekeeping and Sanitation
-
General comments:<br>
-
General neatness of the working areas
-
Tool trailer & conex organized and clean.
-
Proper and safe access and egress to tool trailers and offices.
-
Waste containers provided and used.
-
Adequate supply of drinking water on-site.
-
First aid equipment on-site and accessible.
-
Sanitary facilities adequate and clean.